Ceramic Tile Advice Forums - John Bridge Ceramic Tile

Welcome to John Bridge / Tile Your World, the friendliest DIY Forum on the Internet


Advertiser Directory
JohnBridge.com Home
Buy John Bridge's Books

Go Back   Ceramic Tile Advice Forums - John Bridge Ceramic Tile > Tile & Stone Forums > Tile Forum/Advice Board

Sponsors


Reply
Thread Tools Search this Thread
Unread 02-25-2008, 09:04 PM   #1
treytexag
Registered User
 
Join Date: Feb 2008
Location: Texas
Posts: 2
Yes, Another Vapor Barrier Question

I've read much here and really gotten comfortable what to watch for while my contractor constructs my new bathroom. We're installing a Kohler Cast Iron "Memoirs" tub, 34" x 60" - fairly standard size. It's being installed in an alcove and will be a shower / tub. My contractor says he never puts a vapor barrier behind Hardibacker, but at my request installed it today, after the Plumber set the tub.

Question: He nailed up the poly sheets in layers starting at the bottom - he lapped the tub flange like I asked. However, when I tap my hand in the corners, there isn't enough poly to go all the way into the corner - he nailed it too tight around the corner - I've read about others doing that here too. So my thought is when he goes to banging up the Hardibacker tomorrow, he'll be needing to "stretch", tear, or cut that corner poly to get the Hardibacker in.

Do I need to have him rip down the poly and redo it?

One more question. The Plumber did all the rough ins and passed inspection - then contractor realized that the "recess-it" niche I bought needed to go where the shower water line came up from the valve. So he cut the pipe and rerouted it left, then up, then back right, so the "recess-it" will go there. Now, when I push the copper piping to the mixing valve all the way to the left until the up part on his reroute touches the stud, the nipple for the tub spout is about 1 inch off center drain.

Seems like he's going to have to resweat in a 1 inch longer piece of copper on the shower pipe reroute - so that the pipes can be pushed over far enough so that the tub spigot is centered up.

Does that sound right - ie. that I need to ask him to make sure the tub spigot nipple is centered on the centered draining tub?

Please advise.

Thanks,
Trey
treytexag is offline   Reply With Quote
Sponsored Links
Unread 02-25-2008, 11:39 PM   #2
cx
Moderator emeritus
 
cx's Avatar
 
Join Date: Jul 2001
Location: Boerne, Texas
Posts: 89,530
Welcome, Trey.

Yes, the poly should be loose enough in the corners to allow the CBU to be installed without tearing it. No need for it to be tight at all.

If you want the plumbing centered, he should center it.

My opinion; worth price charged.
__________________
CX

Y'ALL NEW VISITORS READ THIS HERE!
cx is online now   Reply With Quote
Unread 02-26-2008, 12:13 AM   #3
treytexag
Registered User
 
Join Date: Feb 2008
Location: Texas
Posts: 2
Smile

Thank you for the quick response. I'll ask him to fix these items before Hardibacker goes up manana.

Thanks,
Trey
treytexag is offline   Reply With Quote
Unread 02-26-2008, 07:21 AM   #4
Hammy
Registered User
 
Hammy's Avatar
 
Join Date: Oct 2006
Location: Middle Tennessee
Posts: 4,891
Send a message via AIM to Hammy
In my opinion all the questions you raised need to be addressed BEFORE the backer goes up. Hammy
__________________
Kitchen & Bath Makeovers
T & J Construction Services
Manchester, TN 37355

Professionally Built Mold - Mildew - Moisture Resistant Showers
Using Laticrete & Schluter Products

Click here to Visit us on Face Book
Hammy is offline   Reply With Quote
Unread 02-26-2008, 09:21 PM   #5
william35453
Registered User
 
william35453's Avatar
 
Join Date: Jan 2008
Posts: 327
sister on stud for pipe

Hey Trey, no need to resolder pipe, just scab on a piece of 2x4 on the stud to fasten the pipe to. Rip a 2x4 to the width you need and screw it to the old stud between stud and pipe. easier than fooling with new pipe joints.
__________________
William
william35453 is offline   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 09:29 PM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC