shower pan failure?

I am the labor manager for a small floor covering store.I have a customer we did a shower enclosure for and received a call from them about a mildew problem. Upon complete removal of the dry wall entirely around the back side of shower,we have discovered a mold problem and wicking of water from where the liner ends, and up about 18 inches high.Plumbing leaks have been ruled out.
the inside of the shower looks perfect. Could this be from clogged weep holes? Could they be opened up with out tile tear out. Could this be because of lack
of preslope? Any ideas or suggestions would be greatly appreciated.

Dave
Attached Images
 
danodu is offline   Reply With Quote
Sponsored Links
Old 03-08-2005, 02:39 PM   #2
bbcamp
Registered User
 
Join Date: Jul 2002
Posts: 30,274
This is the back side of one of the shower walls?

I don't see a vapor barrier, and you said there was no preslope. Did the backerboard extend down to the liner?


At least 2 strikes against this isntallation. Sorry, but this is a do-over!
bbcamp is offline   Reply With Quote
Old 03-08-2005, 02:44 PM   #3
HDtilegrunt
Registered User
 
Join Date: Dec 2004
Posts: 148
What about that nice green spot under the "T" connection on the lower piece of copper? While you're redoing, has there developed a small leak at that intersection above?
HDtilegrunt is offline   Reply With Quote
Old 03-08-2005, 07:13 PM   #4
John Bridge
Mudmeister
 
Join Date: Mar 2001
Location: Rosanky, Texas
Posts: 67,578
Send a message via AIM to John Bridge
The green spot is probably where some flux dribbled when the piping was originally done.

Hi Dave, Welcome aboard.

What is the material behind the tiles? I can't tell. All backer boards will wick, though. That's one of the reasons that vapor barriers are specified for between the backer and the studs. Your problem could be one of everything you mentioned. No pre-slope, clogged drain weep holes. Wicking like that usually occurs when there is an excess of water in the floor mud bed.
John Bridge is offline   Reply With Quote
Old 03-08-2005, 07:20 PM   #5
danodu
Registered User
 
Join Date: Mar 2005
Posts: 3
showerpan

Thanks for the replys. It is hardibacker on the back of tile. The installer that did the work is now retired but did pan installations for us for many years with out trouble.I have been told that a vapor barrier behind the backer board is frowned on in washington state? Thanks for the help. Dave
danodu is offline   Reply With Quote
Old 03-08-2005, 07:34 PM   #6
John Bridge
Mudmeister
 
Join Date: Mar 2001
Location: Rosanky, Texas
Posts: 67,578
Send a message via AIM to John Bridge
Dave, James Hardie company doesn't frown on it.
John Bridge is offline   Reply With Quote
Old 03-08-2005, 08:11 PM   #7
e3
Registered User
 
Join Date: Jan 2003
Location: mi.
Posts: 4,726
Send a message via Yahoo to e3
neither does the tile industry..slope is required by code.
__________________
Eric
Noble Company
e3 is offline   Reply With Quote
Old 03-08-2005, 08:31 PM   #8
doitright
Retired Tile & Stone Contractor
 
doitright's Avatar
 
Join Date: Apr 2003
Location: Southern Florida
Posts: 11,576
Hi Dave, Welcome!

One of the repairs I did years ago had a similiar problem. Durock down to the liner. No preslope. Drain flange above floor. Durock wicked the water so bad, it would lift past pan liner, and then release the moisture. Literally had water in the basement with not one hole in the shower pan. I love troubleshooting.

You haven't had any problems that you know of!
__________________
John Koessler

"The bitterness of poor quality remains long after the sweetness of a low price is forgotten."

New to the Forum? - Check this out!
doitright is offline   Reply With Quote
Old 03-09-2005, 06:08 PM   #9
danodu
Registered User
 
Join Date: Mar 2005
Posts: 3
I have learned some new information.There was a plumbing leak where the drain pipe was punctured when the shower door enclosure was installed. On the photo you can see where the pipe angles and the band on pipe was installed. This is the pipe that was penetrated.If this was the cause of this and the pan/drypack was saturated,would this not take a very long time to dry out.After fixing the pipe they put a small heater blowing directly on this part of the shower for over a week and seemed to get little or no drying effect.

Thanks again, Dave
danodu is offline   Reply With Quote
Old 03-09-2005, 08:45 PM   #10
MHI
Kitchen & Bath Remodeler
 
Join Date: Mar 2004
Location: Madison, New Jersey
Posts: 2,435
I looked at the picture, and I don't see a pan liner where the blocking is missing by the pipes. Is this on a slab? Maybe no liner was used.
__________________
Matt
MHI is offline   Reply With Quote
Old 03-09-2005, 09:02 PM   #11
Jason_Butler
Tile Setter
 
Join Date: May 2001
Location: Austin, TX
Posts: 4,840
Very good eye Matt. There should be something visible near the plumbing

Jason
__________________
Good..Fast..Cheap. Pick any 2...can't have all three
Jason_Butler is offline   Reply With Quote
Old 03-09-2005, 10:14 PM   #12
doitright
Retired Tile & Stone Contractor
 
doitright's Avatar
 
Join Date: Apr 2003
Location: Southern Florida
Posts: 11,576
Hi Matt & Jason

I was thinking the same thing, but, I also noticed some folded black material at the black abs pipes. Haven't quite figured out what's going on here. It clearly is pan material (maybe Oatey, cause it's black).

Is this maybe where the curb starts? If it is, the liner is loosely folded, and with no support is hanging very low.

Hi Dave

I would almost bet that there is no preslope. You probably have excess moisture in the pan, that won't go away!
__________________
John Koessler

"The bitterness of poor quality remains long after the sweetness of a low price is forgotten."

New to the Forum? - Check this out!
doitright is offline   Reply With Quote
Old 03-09-2005, 10:21 PM   #13
jdm
Registered User
 
jdm's Avatar
 
Join Date: Dec 2004
Location: South Joisey
Posts: 5,217
One of the above posts states that one of the screws from the shower door install punctured the stack. The band clamp is over the puncture. So the pan should make it that far over. The black material between the pipes is probably the pan material flopping in the breeze.
__________________
jeff

Go Rutgers!
jdm is offline   Reply With Quote
Old 03-09-2005, 10:34 PM   #14
Rhode Island Flooring
Bill
 
Rhode Island Flooring's Avatar
 
Join Date: Feb 2005
Location: Rhode Island
Posts: 336
Send a message via AIM to Rhode Island Flooring Send a message via MSN to Rhode Island Flooring
I was wondering, hardibacker is like compressed paper right?...How will it hold up to moisture? Ive only used it on floors.
Rhode Island Flooring is offline   Reply With Quote
Old 03-09-2005, 10:45 PM   #15
jdm
Registered User
 
jdm's Avatar
 
Join Date: Dec 2004
Location: South Joisey
Posts: 5,217
HardiBacker is a fiber-cement product. Like other CBUs, water can pass through it, but will not affect its structural integrity or make it swell.
__________________
jeff

Go Rutgers!
jdm is offline   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 09:06 PM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC