Bathroom Tile Floor(Ceramic) process

Hi All! I am in the process of ripping out the crappy tile job and redoing the bathroom floor.

I have already ripped out the old tile and dry pack. I replaced half the subfloor due to water damage and rebraced the new and existing subfloor. I put down 1/2 inch plywood to match the existing re-usable subfloor. Here is where I start to have questions.

I have roughly a 1.5 inch height difference between the subfloor and the hallway transition. I plan to put down another layer of 3/8 inch ply wood using liquid nails and then screwing every 6 inches down the joist lines.

After that I plan to put down a layer of modified thinset to be topped with Ditra underlayment.

Then I'm not sure if I need modified or unmodified thinset for the layer that goes on top of the ditra for the tile?

I am using 12x12 ceramic tiles. I was directed over here from reddit and seem to be getting conflicting advice there.

My original plan was to put 1/4" hardieback down instead of another layer of 3/8n plywood and then put the ditra and other layers however, that apparently provides no rigidity which makes sense. The current 1/2 inch plywood subfloor is pretty sturdy but I understand the need for thicker subfloor.

So my question is, is the proper layering? And can I use the same thinset for underneath and on top of the ditra?

Layers from top to bottom:

-tile/grout
-thinset
-ditra
-thinset
-3/8 inch ply
-1/2inch ply subfloor

The 1/2 inch plywood floor is there to stay, I'm not ripping it up again so I need to work with what i have.
__________________
Jake
jralexander137 is offline   Reply With Quote
Sponsored Links
Unread 06-30-2019, 02:55 PM   #2
Lazarus
Texas Tile Contractor
 
Lazarus's Avatar
 
Join Date: Oct 2006
Location: Beaumont, Texas
Posts: 8,017
As you were advised, nothing to be gained structurally with the Hardi. Go with the 3/8 or 1/2 and the Ditra. Forget the liquid nails.

Use a modified both under the Ditra and under the tile. Versabond should be fine...
__________________
Laz...

"Women and cats will do as they please, and men and dogs should relax and get used to the idea."
Lazarus is offline   Reply With Quote
Unread 06-30-2019, 02:56 PM   #3
cx
Moderator emeritus
 
cx's Avatar
 
Join Date: Jul 2001
Location: Boerne, Texas
Posts: 89,549
Welcome, Jake.

Your half-inch plywood subfloor is useless for any floor covering, 'specially for ceramic tile. I think jail time is too good for any builder who installs such a product as a first layer of subflooring.

First thing you wanna do is evaluate your joist structure to see if that qualifies for a ceramic tile installation. You can get a good first go/no-go reading by using our Deflectometer in the dark blue bar near the top of this page.

Then to your subfloor. If, and that's a big if, your current half-inch layer is in near pristine condition, it's possible to glue-laminate another layer of minimum half-inch exterior glue plywood with no face of grade lower than C to what you have. To do that, you would need a full spread of wood glue, such as Titebond II or III and screws no more than 6" on center across the entire panels. A bit closer would be better. You want to orient your panels such that they overlap the existing joints (none of which are T&G) as far as possible and be sure to screw close to those joints. You won't find that method in the tile industry standards and it's actually even more complicated than it sounds. But, done correctly, it may give you a suitable subfloor.

You do not want to use Liquid Nails or anything similar that comes in a tube.

Second choice, if you won't remove the existing half-inch layer, which would be by far the best option, is to pretend that existing layer doesn't exist and put a new subfloor of a minimum nominal 3/4" exterior glue plywood, fastened to the joists as though the first layer were not there. You'll need fasteners that will penetrate a minimum of 3/4" into the joist tops. Again, a bit more is better.

Then we can talk about your tile installation. For starters there, I'd recommend you download the Ditra Installation Handbook from the Schluter Ditra website and read their recommendations on the appropriate thinset mortars. I think you'll find that no, according to the product manufacturer, you cannot use the same mortar to install both the Ditra and the tile in your application despite what you've read elsewhere.

My opinion; worth price charged.
__________________
CX

Y'ALL NEW VISITORS READ THIS HERE!
cx is online now   Reply With Quote
Unread 06-30-2019, 03:37 PM   #4
evan1968
Not So Senior Contributor
 
evan1968's Avatar
 
Join Date: Apr 2006
Location: Rochester NY
Posts: 2,762
Go with Laticrete StrataMat and you can use modified thinset under it over it to set the tile.

I'm in agreement with CX that you need to forget the 1/2" is even there. Do it the way he described and you will have a rock solid subfloor.
__________________
Craig
Commercial Tile Installations
KEEP CALM and TILE ON
evan1968 is offline   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Ceramic tile on bathroom wall and floor Cmbaker Tile Forum/Advice Board 15 04-01-2016 03:14 PM
How to replace ceramic tile floor in bathroom w/ waterproofing. DTeague Tile Forum/Advice Board 1 06-14-2011 05:41 PM
Ceramic tile installation process for exterior deck questions. Ward Professionals' Hangout 6 05-06-2008 09:05 AM
Putting ceramic Tile on Bathroom floor emblst Tile Forum/Advice Board 4 07-25-2006 12:36 PM
subfloor/CBU/floor heat/tile process ???'s jane m Tile Forum/Advice Board 11 06-24-2006 08:44 PM


All times are GMT -6. The time now is 09:31 AM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC