|
Sponsors |
|
|
 |
|
05-23-2013, 05:43 PM
|
#1
|
Ohio Tile Contractor.. Hydroban shower specialist
Join Date: Jun 2002
Location: Painesville Ohio
Posts: 5,107
|
better method?
I have 2000' of 2'x2' crema marfil. I really hate this stone.
I can go double plywood ditra then medium bed thinset.
Or
Single layer 3/4" tounge and groove followed by tar paper
Lathe and mud set.
Which would be the best install for this Stine?
I'm thinking mud set
__________________
Scott.
www.scottishtileandstone.com
Laticrete hydroban showers
Mud set stone.
ditra kerdi stone showers waterproof mudset stone backsplashes glass tiles,laticrete, hydroban,ohio,cleveland,painesville,backsplashes,
|
|
|
05-23-2013, 06:03 PM
|
#2
|
Moderator -- Mud Man
Join Date: Jan 2003
Location: Princeton,Tx.- Dallas area
Posts: 34,297
|
Scott, I would mud the floor and then set the stone with Med bed thinset.
|
|
|
05-23-2013, 06:21 PM
|
#3
|
Registered User
Join Date: Sep 2008
Location: Allentown, Bethlehem, Easton, PA
Posts: 2,302
|
Pull mud, it will pay dividends on the install, that is if you have the height for ir
__________________
Joe Lenner

Infinite Ceramic & Stone
www.infiniteceramic.com
NTCA Pennsylvania State Rep
CTEF Certified Installer #769
|
|
|
05-23-2013, 06:22 PM
|
#4
|
Ohio Tile Contractor.. Hydroban shower specialist
Join Date: Jun 2002
Location: Painesville Ohio
Posts: 5,107
|
Davy
You mean pull mud off screed boards?
I've never pulled mud that way. I've always mudded them as I go.
__________________
Scott.
www.scottishtileandstone.com
Laticrete hydroban showers
Mud set stone.
ditra kerdi stone showers waterproof mudset stone backsplashes glass tiles,laticrete, hydroban,ohio,cleveland,painesville,backsplashes,
|
|
|
05-23-2013, 06:23 PM
|
#5
|
Ohio Tile Contractor.. Hydroban shower specialist
Join Date: Jun 2002
Location: Painesville Ohio
Posts: 5,107
|
The stone is 3/4" thick
__________________
Scott.
www.scottishtileandstone.com
Laticrete hydroban showers
Mud set stone.
ditra kerdi stone showers waterproof mudset stone backsplashes glass tiles,laticrete, hydroban,ohio,cleveland,painesville,backsplashes,
|
|
|
05-23-2013, 06:37 PM
|
#6
|
Registered User
Join Date: Sep 2008
Location: Allentown, Bethlehem, Easton, PA
Posts: 2,302
|
When are you doing the job? Enough time for a road trip to Ohio?
__________________
Joe Lenner

Infinite Ceramic & Stone
www.infiniteceramic.com
NTCA Pennsylvania State Rep
CTEF Certified Installer #769
|
|
|
05-23-2013, 06:44 PM
|
#7
|
Ohio Tile Contractor.. Hydroban shower specialist
Join Date: Jun 2002
Location: Painesville Ohio
Posts: 5,107
|
Joe.
Starting next week.
__________________
Scott.
www.scottishtileandstone.com
Laticrete hydroban showers
Mud set stone.
ditra kerdi stone showers waterproof mudset stone backsplashes glass tiles,laticrete, hydroban,ohio,cleveland,painesville,backsplashes,
|
|
|
05-23-2013, 06:46 PM
|
#8
|
Registered User
Join Date: Sep 2008
Location: Allentown, Bethlehem, Easton, PA
Posts: 2,302
|
That would be no
Use mud, medium bed is spendy in comparison.
__________________
Joe Lenner

Infinite Ceramic & Stone
www.infiniteceramic.com
NTCA Pennsylvania State Rep
CTEF Certified Installer #769
|
|
|
05-23-2013, 06:50 PM
|
#9
|
Moderator -- Mud Man
Join Date: Jan 2003
Location: Princeton,Tx.- Dallas area
Posts: 34,297
|
I pull off of mud screeds. That will give you a real flat floor and the med bed thinset will let you adjust and butter up if you need to.
|
|
|
05-23-2013, 07:17 PM
|
#10
|
Ohio Tile Contractor.. Hydroban shower specialist
Join Date: Jun 2002
Location: Painesville Ohio
Posts: 5,107
|
Davy
Are your screeds under your mesh?
5-1 ratio? Kinda like dry pack?
What's minimum thickness.
Thanks
__________________
Scott.
www.scottishtileandstone.com
Laticrete hydroban showers
Mud set stone.
ditra kerdi stone showers waterproof mudset stone backsplashes glass tiles,laticrete, hydroban,ohio,cleveland,painesville,backsplashes,
|
|
|
05-23-2013, 08:22 PM
|
#11
|
Registered User
Join Date: Apr 2008
Location: Albany, NY
Posts: 8,612
|
Depending on howmuch room for height you have, plywood will be thinner, and then use Greenskin to save even more height. I can sell you 9 rolls-
Laticrete 4xlt has a good price point. Is the existing 3/4" floor flat? Using a leveling system?
.
.
|
|
|
05-23-2013, 08:58 PM
|
#12
|
Pondering retirement daily
Senior Contributor
Join Date: Oct 2009
Location: Houston Texas
Posts: 28,236
|
Double layer plywood fixed in place with nail gun and ring shanked nails, Greenskin, and 4XLT. You'll be setting tiled after lunch on the first day if the 2000 sf isn't a complicated mix of spaces.
__________________
Paul 1
For when DIY isn't such a good idea...
Houston TX area Kitchen & Bath Remodeling

http://CabotAndRowe.com
|
|
|
05-23-2013, 09:47 PM
|
#13
|
Registered User
Join Date: Aug 2010
Location: Waunakee, WI
Posts: 1,418
|
By lunch on the first day? You're wicked fast Paul. I'd probably go with mud. If the wood floor isn't perfectly flat I just can't see planeing/shimming joists being done half as fast as mud. But mud and 3/4" stone is gonna have some weight to it.
__________________
Hank
|
|
|
05-23-2013, 10:27 PM
|
#14
|
Registered User
Join Date: May 2006
Location: Deland, FL.
Posts: 4,064
|
We would fat mud and use our laser. Install 100 stones a day or darn close to it (some days). In and out in 12 days depending how cut up it is with sealing and such. Easiest 25 grand you'll make in this business.
__________________
Ben
Rule number one in life: You go with what you got, imperfections and all.
|
|
|
05-24-2013, 02:29 AM
|
#15
|
Tile and Stone Contractor
Join Date: Feb 2003
Location: Maui
Posts: 3,644
|
Even with mud doesn't natural stone require a double layer plywood floor?
Especially with something as 'crack resistant' as Crema Marfil.
|
|
|
 |
|
 
 
Thread Tools |
Search this Thread |
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 01:19 PM.
|
|
|