Ceramic Tile Advice Forums - John Bridge Ceramic Tile

Welcome to John Bridge / Tile Your World, the friendliest DIY Forum on the Internet


Advertiser Directory
JohnBridge.com Home
Buy John Bridge's Books

Go Back   Ceramic Tile Advice Forums - John Bridge Ceramic Tile > Tile & Stone Forums > Tile Forum/Advice Board

Sponsors


Reply
Thread Tools Search this Thread
Unread 01-07-2014, 01:29 AM   #1
Nickdread
Registered User
 
Join Date: Sep 2002
Location: SoCal formerly Austin TX.
Posts: 59
VCT Tile help

Hello, its been a while.
Anyways I was contracted to install Armstrong VCT tile in a medical center.
The install went well and had it sealed and waxed 4 days after install.
The administrator is concerned about some cracks between the tiles 1/16 or less. I had another couple of coats of wax put on but little or no change.
Is there a process to fill these cracks so to avoid buildup of medical waste?
A floor guy told me to use a propane "burnasher" high speed buffer that will melt the wax and irrigate it into the joints better.
Any guidance would be greatly appreciated!
Nickdread is offline   Reply With Quote
Sponsored Links
Unread 01-07-2014, 07:09 AM   #2
jcsa
Tile Contractor
 
Join Date: Jul 2009
Location: San Antonio, Texas
Posts: 1,063
Vct

Nickdred,
I don't know how much help you are going to receive here for VCT. We are in the hard tile trade here. Maybe one of the moderators can steer you in the right direction. I would not touch a soft good with a ten foot pole. Good luck. J.C.
__________________
JC
Certified Tile Installer # 26
Cox Tile, Inc.

jcsa is offline   Reply With Quote
Unread 01-07-2014, 07:29 AM   #3
reefone
tile setter
 
Join Date: Apr 2012
Location: michigan
Posts: 699
use some caulk to fill the gaps.
__________________
Jerry
tile setter 12yrs exp.
reefone is offline   Reply With Quote
Unread 01-07-2014, 08:29 AM   #4
tile dummy
scooter
 
Join Date: Jun 2010
Location: stroudsburg Pa.
Posts: 271
Nick, I know it's no help now but next time you do vct clean off the edges on the whole stack with your hands.Peel the box edges back like a bananna and rub your hands up and down and across the sides. When they are made they get little residual micro beads on the edges and it will hinder you from getting them really tight. The only thing i know of at this point is a matching caulk.
__________________
Scott
tile dummy is offline   Reply With Quote
Unread 01-07-2014, 09:40 AM   #5
Scottish Tile and Stone
Ohio Tile Contractor.. Hydroban shower specialist
 
Scottish Tile and Stone's Avatar
 
Join Date: Jun 2002
Location: Painesville Ohio
Posts: 5,107
Take one of the tiles and run your knife along the side.. Take the scrapings and smash into the joint. Its easier to do it while the vct glue is still wet. You may have to heat the joint up a bit to get the glue sticky.
__________________
Scott.

www.scottishtileandstone.com
Laticrete hydroban showers
Mud set stone.

ditra kerdi stone showers waterproof mudset stone backsplashes glass tiles,laticrete, hydroban,ohio,cleveland,painesville,backsplashes,
Scottish Tile and Stone is offline   Reply With Quote
Unread 01-07-2014, 10:06 AM   #6
ceramictec
Tampa Florida Tile Contractor
 
ceramictec's Avatar
 
Join Date: Oct 2007
Location: Tampa, Florida
Posts: 26,509
cant you use some matching floor patch and kinda grout the small cracks?
I have seen some vct crews do that with white 12x12 vct to hide some steps & gaps.
__________________
Brian

Tampa Florida Tile Installation
^^Check out our Blog^^
ceramictec is offline   Reply With Quote
Unread 01-07-2014, 10:51 AM   #7
Hank B.
Registered User
 
Join Date: Aug 2010
Location: Waunakee, WI
Posts: 1,418
I've used all of the tricks mentioned. Being vinyl, Vct can be very sensitive to temperature changes. Going forward, always let it sit in the rooms it will be installed in a couple days prior to installing to acclimate. Did the gaps appear after the installation? That happens when the temperature of the building/ slab is reduced. The last vct job I did was last December. Roughly 8000 ft. The temperature was pretty warm at the start of the job, but as the building got colder from there being no heat and the weather getting colder. gaps started appearing. The job super asked how I'd fix them and I told him he was going to, when he finished installing the heat. heat went on, gaps went away.
__________________
Hank
Hank B. is offline   Reply With Quote
Unread 01-07-2014, 09:06 PM   #8
Tilehelperdan
Registered User
 
Join Date: Dec 2008
Location: Kenosha, Wi
Posts: 1,025
What Scott said. Be careful if you use a torch to heat it up. A hot hair dryer won't burn the tile. Just enough to goo up the glue some. Not sure if the wax being on it will hurt or not. Might want to strip the wax in those spots.
__________________
I'm Dan.

I am the master of my fate:
I am the captain of my soul.
-"Invictus" by William Ernest Henley
Tilehelperdan is offline   Reply With Quote
Unread 01-07-2014, 10:35 PM   #9
Bellsfloors
Tile, Wood, LVT, Home Renovation Contractor
 
Bellsfloors's Avatar
 
Join Date: Aug 2003
Location: Kansas
Posts: 1,339
I have installed hundreds of thousands sq ft of VCT and there is nothing I know of you can do at this point if it is already installed and waxed... Also FYI all VCT shrinks with age and the gaps will be getting larger over time anyway. As said before be sure to clean edges of the Vct prior to installation. Also, product to product, the quality in dimension can vary and sometime the gaps are completely impossible to avoid. The geometry of the substrate as to being flat or wavy will also distort your layout and mess up the chances of getting real tight joints regardless of what you do.

There are some sealers and fillers you could use but they will fail with time since the product *WILL* shrink as the product ages.

I know this is not any help in closing the gaps but it is valuable information to for you to know before doing another job of VCT job, especially commercial where the problem in gapping amplifies when doing much larger areas.

BTW be careful if trying the heating method thinking the product will expand. Vinyl, Rubber and plastics shrink when heated unlike most other materials in this world. Ever have a tonneau cover on a pickup? They too will shrink and fit much tighter on the bed in a hot summer compared to being loose fitting in the winter...Many vinyl products do this and do not follow the same expanding and shrinking characteristics of the subfloor.
__________________
Tracy

Flooring-Tile-Waterproof Showers
www.AttentionToPerfection.com

Last edited by Bellsfloors; 01-07-2014 at 10:41 PM.
Bellsfloors is offline   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
tile over vct faruga55 Tile Forum/Advice Board 1 12-14-2010 08:57 PM
VCT tile identification ceramictec Professionals' Hangout 9 04-29-2009 11:24 PM
tile over asbestos vct clay daniels Tile Forum/Advice Board 10 11-28-2007 10:53 PM
VCT tile removal Tile Bob Professionals' Hangout 5 04-09-2007 12:22 PM
Tile Over VCT rednavel Professionals' Hangout 23 12-05-2006 10:27 PM


All times are GMT -6. The time now is 04:13 AM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2022, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC