Location: Indianapolis
Posts: 2,273
Absolute worst tile finishing job

Folks I looked at the absolutely WORST tile finish job today. Got a call from a guy and he said that he didn't think the guy that did the work did it right. Anyway I went to look at it and the guy that tiled this house did the ABSOLUTEY WORST tile finishing job that I have ever seen.

Walked in the house and the 1st problem was the entry, the tile looked ok but the guy did not take up the qtr rnd when he tiled and tiled right up to it and then grouted the tile to the qtr rnd. He did that in every room that he tiled (kitchen, hall bathroom, master bathroom and laundry room)and he did not even get all of the grout wiped up. To make matters worse he didn't even put down the correct color grout. Also in the master bathroom he left a bucket of grout, did not wipe up all the grout (like in the closet) , so I will have to use some grout remover to get that grout up.

For the qtr rnd the best I can do is to chip out all of the grout and thinset from the qtr rnd (which is really shoe molding) and put in the largest qtr rnd that I can find. I told the customer that there would be some places that I would not be able to cover the gap w/ the new qtr rnd but I would do the best I could.

For the wrong color grout I'm going to color some of it and in the entry way take out that grout because it was not very hard anyway and put in the correct color.


Here's some pictures, sorry for the size, had to use came from my cell phone.

This guy was a total finisher looser.....there's also some drywall tht I have to finish
Attached Images
     
__________________
Pat Harris
PAMM Enterprises
"Why call a handyman when you can call A HandyWOMAN?
pitterpat is offline   Reply With Quote
Sponsored Links
Unread 03-31-2007, 02:53 PM   #2
pitterpat
Bathroom Remodels and Schluterville Grad
 
pitterpat's Avatar
 
Join Date: Sep 2004
Location: Indianapolis
Posts: 2,273
Everything the guy did he did could not finish it properly. Have to put a threshold between the kithen tile and the fam room wood floor. This guy was a real hack. As you can see in one of the opictures, when came back to scratch out the grout to change the color he cut into the threshold between the tile and the wood floor

More pictures
Attached Images
  
__________________
Pat Harris
PAMM Enterprises
"Why call a handyman when you can call A HandyWOMAN?
pitterpat is offline   Reply With Quote
Unread 03-31-2007, 04:08 PM   #3
dbol
Registered User
 
dbol's Avatar
 
Join Date: Apr 2006
Location: southwest PA
Posts: 923
Pat,
I can see the "jitters" in his wipes on the grout. the bar was opening at noon and all of contacts would be there. He could not miss out on future work.
__________________
doug
dbol is offline   Reply With Quote
Unread 03-31-2007, 05:19 PM   #4
John Bridge
Mudmeister
 
Join Date: Mar 2001
Location: Rosanky, Texas
Posts: 68,969
Send a message via AIM to John Bridge
Pat, you're gonna hafta start bringing your camera with you. The cell phone ain't quite doin' it.
John Bridge is offline   Reply With Quote
Unread 03-31-2007, 05:34 PM   #5
pitterpat
Bathroom Remodels and Schluterville Grad
 
pitterpat's Avatar
 
Join Date: Sep 2004
Location: Indianapolis
Posts: 2,273
I know that cell phone camera sucks!! My main camera is in the shop "warranty" repair. Been in the shop for 3 wks, what a bummer. My other camera is big and bulky and I got spoiled on the one I can carry in my pocket. I'm sure I'll get this job.....don't I always get these crappy ones, ha, ha, ha. I'll take pictures when I start the job.

There's about 200 LF of qtr rnd to replace. Which means there is about 200 LF of grout to chunk out, yuck!!!
__________________
Pat Harris
PAMM Enterprises
"Why call a handyman when you can call A HandyWOMAN?
pitterpat is offline   Reply With Quote
Unread 03-31-2007, 08:47 PM   #6
Tool Guy - Kg
Moderator -- Wisconsin Kitchen & Bath Remodeler
 
Tool Guy - Kg's Avatar
 
Join Date: Feb 2005
Location: Oak Creek, WI
Posts: 23,541
It could be worse. I used to have a Sony Mavica. I think it was the first digital camera ever. Prolly, 5" x 5" x 1 1/2" thick. The thing actually had a slot for a 3 1/2" floppy disk to slide it! I gave it away...not sure they appreciated it, though. What a piece that was.
Attached Images
 
__________________
Tonto Goldstein... but my friends call me Bubba

Help an awesome summer camp!
Tool Guy - Kg is offline   Reply With Quote
Unread 04-01-2007, 05:52 AM   #7
pitterpat
Bathroom Remodels and Schluterville Grad
 
pitterpat's Avatar
 
Join Date: Sep 2004
Location: Indianapolis
Posts: 2,273
Kurt, When I used to work @ UPS we had those things.
__________________
Pat Harris
PAMM Enterprises
"Why call a handyman when you can call A HandyWOMAN?
pitterpat is offline   Reply With Quote
Unread 04-01-2007, 08:21 AM   #8
opiethetileman
Registered User
 
opiethetileman's Avatar
 
Join Date: Jan 2004
Location: in a closet with a pail of hydroban and a pail of spectraLock waiting to get out.
Posts: 6,788
Pat if you are cutting out the quater round that is put down now. Go get the bosh flush cut saw and use that it will save ya lots of time.
opiethetileman is offline   Reply With Quote
Unread 04-01-2007, 11:28 AM   #9
bctile601
Tile Contractor
 
bctile601's Avatar
 
Join Date: Apr 2003
Location: johnson city, NY
Posts: 1,881
Rather than scratching out the wrong color grout, why not color the grout with a colorant / sealer ? Easy to do.
__________________
Brian---

No one cares how much you know until they know how much you care

bctile.com
bctile601 is offline   Reply With Quote
Unread 04-01-2007, 02:50 PM   #10
pitterpat
Bathroom Remodels and Schluterville Grad
 
pitterpat's Avatar
 
Join Date: Sep 2004
Location: Indianapolis
Posts: 2,273
Opie,

How will that saw help me....I'm not sure how to use it on the qtr rnd. Do I slip the blade between the trim and the qtr rnd or 2. do I slip the blade between the qtr rnd and the floor? Thanks.

Brian, I will color some of the grout but the grout in the entry he did such a bad job of it, it needs to be taken out. The grout in the entry was so bad I could scratch it out w/ my pocket knife.
__________________
Pat Harris
PAMM Enterprises
"Why call a handyman when you can call A HandyWOMAN?
pitterpat is offline   Reply With Quote
Unread 04-01-2007, 03:15 PM   #11
bctile601
Tile Contractor
 
bctile601's Avatar
 
Join Date: Apr 2003
Location: johnson city, NY
Posts: 1,881
Given all of the issues you have raised about how the gentleman ' finished ' the tile jobs, this concerns me as to how he installed the tile. I would not want to spend a good amount of money to have somebody hack in a tile job, only to leave more work to be done and more cost , BUT I also would not want to cut any other corners at this point and would strongly be considering removal of the entire project and begining from scratch with a new product and reputable contractor.
__________________
Brian---

No one cares how much you know until they know how much you care

bctile.com
bctile601 is offline   Reply With Quote
Unread 04-01-2007, 07:55 PM   #12
guitarsman
Flooring Contractor-- Gig Harbor, WA.
 
Join Date: Mar 2006
Location: Gig Harbor, Washington
Posts: 234
Hi Pat. I've seen a lot of your posts and you do get the tough ones. How are you going to dig out the grout? I use a Dremmel with the grout removing kit, it works fast .
__________________
Phil
guitarsman is offline   Reply With Quote
Unread 04-01-2007, 07:58 PM   #13
John Bridge
Mudmeister
 
Join Date: Mar 2001
Location: Rosanky, Texas
Posts: 68,969
Send a message via AIM to John Bridge
Kurt, I've still got my Mavica. Thing cost a thousand dollars when it was new. It's to expensive to just give away.
John Bridge is offline   Reply With Quote
Unread 04-01-2007, 08:33 PM   #14
Tool Guy - Kg
Moderator -- Wisconsin Kitchen & Bath Remodeler
 
Tool Guy - Kg's Avatar
 
Join Date: Feb 2005
Location: Oak Creek, WI
Posts: 23,541
It's a paperweight!!!

I give you 2 bits for it.....my final offer. I'll send it to Opie for target practice.
__________________
Tonto Goldstein... but my friends call me Bubba

Help an awesome summer camp!
Tool Guy - Kg is offline   Reply With Quote
Unread 04-02-2007, 09:15 AM   #15
pitterpat
Bathroom Remodels and Schluterville Grad
 
pitterpat's Avatar
 
Join Date: Sep 2004
Location: Indianapolis
Posts: 2,273
Phil,

I'll use my Fein Tools Multimaster w/ diamond blade; it vibrates and does not create a lot of dust.

John & Kurt,
Just got off the phone w/ Cannon repair, mins., and they don't know when the part is coming in to repair the camera. The call got escalated all the way from cust svc, to ops mgr, to cust relations. Final outcome from cust. relations is that if by tomorrow he does not know when the part will be in he will order me a new camera (order camera from Chicago or CA, it goes to Va, then he sends it to me in Indy). Doesn't it make more sense to just order from CA or Chicago and have them send it to me? . That's what I told him....also I told him I know that his hands are tied and he just has to do what he is told, not use common sense.

Pat
__________________
Pat Harris
PAMM Enterprises
"Why call a handyman when you can call A HandyWOMAN?
pitterpat is offline   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 01:09 PM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2023, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC