Complete rebuild 75 year old bathroom

I've read a bunch a the posts and with the amount of info, I bet someone could point me at a post that answers my question directly, but I haven't found it, so here goes...
I'm completely rebuilding a 75 yo 2nd floor bathroom (except leaving the cast iron good condition tub in place). This is the 5th bath I've redone in this house, so I've had some experience (learned hard way) about making things square and level. The room is completely stripped to the studs and all the old piping/electrical is out. The joists are 2x10 16"oc. The old sub floor was 4 inches of dry concrete with about 2 inches of hard concrete poured between the joists (on top of planks about 1/2 way down the joists) - it's all gone now - what a nightmare! The top 1 1/2 to 2 inches of each joist was peaked (looks like with an axe) to keep the overlying cement from cracking along the joists. In addition, there are many holes through the joists for 2" drain pipes and many notchings along the tops and bottoms for water supply lines. The area to be tiled is about 66" x 63" The max joist span between structural support is 8'.
My plan is to sister all the joists with 2x6 and put some additional 2x6 blocking for stiffening. In the past, I've then used 3/4 ply and 1/2 ply followed by 1/4 cement board (with thinset between the top ply and the cement board) as a subfloor prior to ceramic tile. Am I on target?
Thanks!
BillArlVA is offline   Reply With Quote
Sponsored Links
Unread 08-08-2004, 11:44 AM   #2
John Bridge
Mudmeister
 
Join Date: Mar 2001
Location: Rosanky, Texas
Posts: 68,897
Send a message via AIM to John Bridge
Hi Bill, Welcome to the forum.

I'd say you're on target. I would have left the old mud bed in place. It held up a long time.

I'll add you to the list of threads for Bob Campbell, our engineer, to look at when he comes in tonight or in the morning.
John Bridge is offline   Reply With Quote
Unread 08-08-2004, 12:16 PM   #3
BillArlVA
Registered User
 
Join Date: Aug 2004
Posts: 2
Thanks! I wanted to leave the mud subfloor, but the old galvanized pipes were in it and if I was doing this much work, I figured it was time to replace the galvanized, too.
BillArlVA is offline   Reply With Quote
Unread 08-09-2004, 10:10 AM   #4
bbcamp
Registered User
 
Join Date: Jul 2002
Posts: 30,274
Your plan looks good to me!
bbcamp is offline   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 01:51 PM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2023, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC