Help for a lowly DIY guy!
Hi everyone, my wife and I are getting our home ready for sale and part of it has required me to rip up old tile and lay new, unbroken tiles in its place. I've done my fair share of tiling and am pretty confident in my ability to lay it properly. My problem comes in the form of water.
I removed our water heater to get to the floor underneath it. I put 5 courses of 6x24 inch tile using acrylpro adhesive. Thinking it would be alright, my wife started the shower to clean off, and I wasn't thinking that the open outlet pipe would become a torrent of cold water when she started the shower. The tile had been laid about 5 hours prior and was, well, showered with probably a half gallon of water before I could run upstairs and tell her to shut the water off.
My question is, because I couldn't dry the water in the open grout lines, is my tile job ruined? I know for a fact the adhesive wasn't even close to being set yet, just a dry skin over what was exposed. Will the water dissipate given time or am I in for a few hours of removal, scraping, and re-laying of tile? Thanks in advance!
James
__________________
James
|