Unread 04-26-2021, 09:08 AM   #31
Shaklee3
Registered User
 
Join Date: May 2018
Location: San Diego, California
Posts: 97
Hi everyone, I got that tile removed fairly successfully with minimal damage. I put the kereck strip on and am feeling a lot more comfortable about the waterproofing there. I also added a kerdi band patch behind where the fleece was slightly damaged.

Anyways, a new question:

I left my first row of tile in order to do the mud bed. the second row tile is 6.5" up the wall currently, and the tiles are 3-7/8" tall. When I originally was looking at the minimum mud bed requirement, I must have seen some old posts on here, because several places said 1.5-1.75" over wood subfloor (which is what I have), but I see now the official Schluter guide says 1" minimum. My farthest corner is 33" away, so rounding up that gives a 3/4" increase from the drain.

With just the tile two 1/16" grout lines, that leaves 6.5" - (3-7/8") - 1/8" = 2.5". Wife chose a ~1/8" porcelain floor tile, so with thinset I think that's around 1/4", bringing me to a final height of 2.25", and a drain height of 2.25-3/4 = 1.5".

With that being said, you can see I'm 0.5" over the min thickness. That's not a big deal, except this is my first time with mud, and I didn't want to have too much to deal with (multiple mud buckets) during the install. For a first timer, should I just go for it with the 1.5" drain height, or should I possible increase the slope and use a lower drain height? The Mapei site says I'd need about 9 bags of 4:1 mix, or about 450lbs, so I'm a bit concerned I can't moved fast enough before it dries with that much.
__________________
Cliff

Last edited by Shaklee3; 04-26-2021 at 09:20 AM.
Shaklee3 is offline   Reply With Quote
Unread 04-26-2021, 10:08 AM   #32
BIGPHIL
Registered User
 
BIGPHIL's Avatar
 
Join Date: Oct 2011
Location: Gig Harbor, WA
Posts: 194
Cliff,

The site has a nice mud bed calculator here

Instructions here

I wasn't braining and didn't notice your floor was not it. The corner piece should have gone in after the mud bed and floor were waterproofed. You'll likely need to add another piece there when you Kerdi band the wall to floor junction.
__________________
Phil
BIGPHIL is offline   Reply With Quote
Unread 04-26-2021, 10:39 AM   #33
Shaklee3
Registered User
 
Join Date: May 2018
Location: San Diego, California
Posts: 97
Hi Phil, I *only* put in the corner piece on top of the curb. I did not put in the bottom curb corner piece yet, because as you said, that goes in after the mud bed/membrane is down.

By the way, it seems I cannot use the calculator as it is for my situation, because the drain height only goes to 1.25", and I had planned it at 1.5". I must have had an error before, because I plugged my numbers into mapei's calculator: https://www.mapei.com/us/en-us/produ...repair-mortars and with an average height of 1.875, that's 6 bags instead, which roughly agrees with the JB calculator. Also, I have that triangular bench in there that cuts off a little bit as well, so do you think 6 bags is manageable for a newbie?
__________________
Cliff

Last edited by Shaklee3; 04-26-2021 at 10:50 AM.
Shaklee3 is offline   Reply With Quote
Unread 04-26-2021, 12:53 PM   #34
BIGPHIL
Registered User
 
BIGPHIL's Avatar
 
Join Date: Oct 2011
Location: Gig Harbor, WA
Posts: 194
You should be able to handle it. A helper would be nice so they could mix another batch while your working on the first couple of buckets. The best water ratio for that 4-to-1 has been said to be 2q 8oz (2.25q)...not the minimum 3q as recommend on the bag.
__________________
Phil
BIGPHIL is offline   Reply With Quote
Unread 04-29-2021, 08:40 PM   #35
Shaklee3
Registered User
 
Join Date: May 2018
Location: San Diego, California
Posts: 97
Mapesil

Hi everyone, I didn't know if I should make a new topic about this since it's a good searchable topic that others googling might want to know. I've settled on using Flexcolor CQ in the shower, and I was looking for the matching caulk. Mapei has two products: Mapesil T and Mapesil T Plus. These products look extremely similar with the only different I could find being that the plus has extra adhesion. Does anyone recommend one over the other for a shower application? If this would be a better general question I can make a new topic. Thanks!
__________________
Cliff
Shaklee3 is offline   Reply With Quote
Unread 04-29-2021, 09:53 PM   #36
cx
Moderator emeritus
 
cx's Avatar
 
Join Date: Jul 2001
Location: Boerne, Texas
Posts: 93,629
If you'll download the manufacturer's TDS for each product perhaps you'll find some difference. Only difference I could find was that the "plus" product has a shorter shelf life. I couldn't otherwise tell they weren't the same product.

You might wanna call MAPEI's technical services line and ask them the difference. 800-992-6273

There might also be a difference in price, but I know nothing at all about that.

My opinion; worth price charged.
__________________
CX

Y'ALL NEW VISITORS READ THIS HERE!
cx is offline   Reply With Quote
Unread 04-29-2021, 10:34 PM   #37
Shaklee3
Registered User
 
Join Date: May 2018
Location: San Diego, California
Posts: 97
Thanks cx, I'll give them a call tomorrow. The main reason I was asking is because my local big box only has the plus in the particular color that I'm looking for. And oddly enough, the plus is less expensive than the regular.
__________________
Cliff
Shaklee3 is offline   Reply With Quote
Unread 04-30-2021, 08:54 AM   #38
Shaklee3
Registered User
 
Join Date: May 2018
Location: San Diego, California
Posts: 97
I called Mapei and the response was that "they're really the same thing. The Plus is just geared towards Lowes". So I have no idea why there are two products (and in fact, Lowes carries both), but there's your answer if anyone is looking at this.
__________________
Cliff
Shaklee3 is offline   Reply With Quote
Unread 05-02-2021, 07:27 PM   #39
Shaklee3
Registered User
 
Join Date: May 2018
Location: San Diego, California
Posts: 97
Finished the mud bed. Was kind of fun in the end. Got about a 3/8"/ft pitch to longest point. Finished the day by misting it and covering with plastic.
Attached Images
 
__________________
Cliff

Last edited by Shaklee3; 05-02-2021 at 10:39 PM.
Shaklee3 is offline   Reply With Quote
Unread 05-10-2021, 09:59 AM   #40
Shaklee3
Registered User
 
Join Date: May 2018
Location: San Diego, California
Posts: 97
Hi everyone, I'm doing the 24h leak test now, and watching it like a hawk. It's been in there about 2 hours now, and the line hasn't noticeably changed. However, I do notice wicking up the walls, which I'm assuming will contribute somewhat to water loss.

Is there a general rule of thumb of how much might be wicked up the side and cause the level to drop? I searched old threads and saw wicking is common, but I didn't see any concern over the water level changing because of it.
Attached Images
 
__________________
Cliff

Last edited by Shaklee3; 05-10-2021 at 11:05 AM.
Shaklee3 is offline   Reply With Quote
Unread 05-11-2021, 07:56 AM   #41
Shaklee3
Registered User
 
Join Date: May 2018
Location: San Diego, California
Posts: 97
For anyone reading this, the wicking did not affect the line at all. My flood test successfully passed after 24h with no noticeable drop in water!
Attached Images
 
__________________
Cliff
Shaklee3 is offline   Reply With Quote
Unread 05-11-2021, 03:55 PM   #42
Shaklee3
Registered User
 
Join Date: May 2018
Location: San Diego, California
Posts: 97
Another update, and I apologize for all the posts. I cut the quartz curb topper to the proper size and it's ready to go on now that the water test is over. However, after calling 5 different glass companies in the San Diego area, NONE of them said they could install the glass without drilling into the curb. I've read as many posts on this as I can on these forums, and the general rule is that while it can be done, it can be very difficult to find someone that will do it.

For those that had the glass installed with the hole + silicon, has anyone lived to regret it?
__________________
Cliff
Shaklee3 is offline   Reply With Quote
Unread 05-12-2021, 07:15 AM   #43
ss3964spd
Moderator
 
ss3964spd's Avatar
 
Join Date: Jul 2005
Location: Fairfax, Va
Posts: 4,397
Send a message via Yahoo to ss3964spd
How thick is the quartz, Cliff?

While they will want to drill into the quartz to install the brackets, they don't need to drill all the way through it. If the quartz is, say 1" thick they could drill their hole only 3/4" deep. They'd then cut the screw to 3/4", fill the hole with epoxy, set the bracket in place, insert the screw, install the glass. Once the epoxy sets the bracket isn't going anywhere.
__________________
Dan
---------------------------------------------------------------------------------
If I recall correctly my memory is excellent, but my ability to access it is intermittent.
ss3964spd is offline   Reply With Quote
Unread 05-12-2021, 08:23 AM   #44
Shaklee3
Registered User
 
Join Date: May 2018
Location: San Diego, California
Posts: 97
It's 3/4" thick. I called about 15 total places last night and I did find one that said they don't have to drill into the curb. I'll keep you updated!
__________________
Cliff
Shaklee3 is offline   Reply With Quote
Unread 07-23-2021, 10:37 AM   #45
Shaklee3
Registered User
 
Join Date: May 2018
Location: San Diego, California
Posts: 97
Just a quick updated on this one. I finished tiling a while ago. I took Davy's recommendation and used Prism on the shower walls and floors instead of FlexColor CQ as I did on the bathroom floor. I really like that grout. Consistent color all around, and was fairly easy to work with.

Next, I was mostly waiting for the glass guys to finish. If you recall earlier in the thread, I couldn't find anyone to NOT puncture the curb doing glass, so I decided to just roll the dice and get it done.

I chose installers that were at the higher price range thinking they would do a better job. Believe it or not, the first time they installed the glass it was a full 1" out of plumb from top to bottom! You can see in the picture how bad it looked with the laser level. The tile grout lines are in a perfectly-straight line, for what it's worth. So they had to remove all the glass and start over, which meant not only did I have to repair all the Kerdi, but now there were holes in the curb and pony wall. The promised to reuse the same holes the second time, but that did not happen and they drilled new holes that are underneath the clamps, probably thinking I wouldn't notice. Anyways, that whole process was awful, and even after the second round, the door is still bowed about 1/4" from top to bottom like C shape. Fixing that would again request taking clamps out, which I just don't want to do.

Anyways, lesson learned, I guess? I'm going to apply as much clear sealer around those clamps as possible, but I know it'll never be perfect.
Attached Images
  
__________________
Cliff
Shaklee3 is offline   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Cliff's First Shower Rebuild OutDoorsMan Tile Forum/Advice Board 17 05-16-2015 04:11 PM
Matt and Crystal's Master Shower Thread Captain_Matt Tile Forum/Advice Board 5 04-26-2014 09:18 AM
Cliff's kitchen project - Subfloor Q's cliff Tile Forum/Advice Board 19 03-14-2013 09:40 PM
Jeff's Master Bathroom Thread - Seeking Professional Advice! allthingsgiant Tile Forum/Advice Board 43 02-21-2012 06:13 AM
Rick's Master Bath & First Thread Sminfiddle Tile Forum/Advice Board 15 11-18-2007 08:28 AM


All times are GMT -6. The time now is 12:16 AM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC