New projects--HELP!

First I want to say that I have been hanging out at this forum on and off for the last several months and am very impressed with everyone's generosity and hospitality and knowledge.

I will be starting a series of bathroom projects in this year. My experience so far is tiling about 600sft in my family room. The tiles were porcelain. I did something a little unorthodox on this project. I had a minimum of 1.25inch of subflooring with 16 inch oc 2X10 joists. I did not want to raise the floor anymore or deal with cementboard so I used Laticrete sound and isolation mat. This has worked very well and I am very pleased. It was about a dollar a sft. and so it wasn't cheap but for those that want a high quality product to use over wood this is very good. I also used Laticrete's new epoxy grout (forget the name). It was very easy to work with and am very pleased. I will be using this grout for everything from now on. It honestly seems perfect. One last thing that might be unusual is that the tiles were supposed to look old with broken edges. The edge of the tile is straight but it tapers up to where it is rough and broken and old looking. I put the tiles in WITH ZERO space between the tiles (of course zero is not possible and during installation there is always a small gap). The tiles seem to made to be installed this way as the smaller tiles are exactly 1/2 the size of the larger. I put the grout in level with the top of the tile (almost...not quite level). Once installed the grout line is about 1/2 inch wide and very irregular. The tiles now look like they were installed with broken and irregular edges...they look perfect and I am very pleased. The tiles were Cerdomus from Italy. Has anyone seen this before? I have told several people about this and they give me weird looks. I just wanted to share all of my experiences as hopefully this can help someone else here.

Now, I am totally remodeling three of my bathrooms (one at a time). The current one I will be putting in a custom tiled shower. The other two will have Roman baths as these seem to be no more work than a shower and I am not worried about the drain.

On this project, I will have one niche and a corner seat. I will be using the Kerdi drain and either the Kerdi waterproofing system or the Laticrete blue waterproofing system depending on cost, ease of installation, etc.

I am ready to begin building the shower area now and cannot find the best way to build the curb for a Kerdi type of install (did a search). Do I just use three 2X4s stacked one on top of the other? What is the best way to secure these and prevent any movement? I have ideas but want to see what other's experience is. Is there any reason to cover the 2X4s with drywall (remember it is a Kerdi type install) or cement board or do anything else?

I am sure I will have other questions also but this is my first and I would appreciate any help. Thank you guys in advance...you are great.
Derek Cornelius is offline   Reply With Quote
Sponsored Links
Unread 03-13-2005, 05:19 AM   #2
tileguytodd
Official Felker Fanatic
 
tileguytodd's Avatar
 
Join Date: Jun 2002
Location: Northern MN
Posts: 14,398
Derek, welcome aboard!!Schluter has a preslope pan and curb available for its Kerdi system.
Contact www.tile-experts.com for additional information and great prices with even better service.
Tell David tileguytodd sent ya and he may even stop and buy you a beer if he ever heads through your town

Seriously,he really is the best when it comes to buying schluter products and helping you to determine the absolute best method for your particular situation. Please cmon back after talking with him and tell me how it went,what you decided to do and where we can lend additional support to your project.Its going to cost you some before and afters though, we just love pictures

P.S. Cerdomus is a manufacturer with many different lines and i am not familiar with the one you chose.If you like it,that is whats important.Spectraloc is laticretes new epoxy and its been improved even more for 2005.If you are willing to take the extra time and effort to use epoxy grout,not only do you have no fear, you gave yourself the best possible installation on the planet.
I salute you and your courage!!
__________________
TIP YOUR TILE MAN, His Retirement plan is not nearly as lucrative as yours and his waning years will be far more painful to boot.
He gives much so you can have a Beautiful Home!!
tileguytodd is offline   Reply With Quote
Unread 03-13-2005, 12:29 PM   #3
Derek Cornelius
Registered User
 
Join Date: Mar 2005
Posts: 13
Todd, thank you for your reply. However, I definitely do not want to buy a preslope. I want to use the Kerdi method on a single preslope/mudbed.

I also don't want to use a preformed curb. Can anyone here help me with this situation? I know this cannot be a difficult problem but I just cannot find the right answer anywhere. Please help.
Derek Cornelius is offline   Reply With Quote
Unread 03-13-2005, 01:23 PM   #4
John Bridge
Mudmeister
 
Join Date: Mar 2001
Location: Rosanky, Texas
Posts: 68,937
Send a message via AIM to John Bridge
Welcome aboard, Derek.

The three stacked two by fours works fine. You will cover them with either sheetrock or backer board. Then the Kerdi. I also make curbs out of single two by fours laid on edge and covered with drywall. Makes for a narrow curb that I think is more pleasing to the eye. Don't do this last one over a concrete floor, though. Use bricks for that and cover them with Kerdi.
John Bridge is offline   Reply With Quote
Unread 03-13-2005, 01:27 PM   #5
John Bridge
Mudmeister
 
Join Date: Mar 2001
Location: Rosanky, Texas
Posts: 68,937
Send a message via AIM to John Bridge
Here is a curb built with bricks over a concrete slab. We fill the voids with thin set and cover the curb with Kerdi.
Attached Images
 
John Bridge is offline   Reply With Quote
Unread 03-13-2005, 04:20 PM   #6
Derek Cornelius
Registered User
 
Join Date: Mar 2005
Posts: 13
Thank you John for your help. It is much appreciated.

I have another question also. Do all the joints in drywall/cement board have to be taped? For instance, for the curb, do the 90degree angles need to be taped. I am surely guessing so but just wanted to know for sure.
Derek Cornelius is offline   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 12:37 AM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2023, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC