Ceramic Tile Advice Forums - John Bridge Ceramic Tile

Welcome to John Bridge / Tile Your World, the friendliest DIY Forum on the Internet


Advertiser Directory
JohnBridge.com Home
Buy John Bridge's Books

Go Back   Ceramic Tile Advice Forums - John Bridge Ceramic Tile > Tile & Stone Forums > Tile Forum/Advice Board

Sponsors


Reply
Thread Tools Search this Thread
Unread 08-26-2007, 07:07 AM   #1
coffee4me
Registered User
 
Join Date: Jul 2005
Posts: 26
Arrow bathroom question

Hi,

My name is Danny.
A couple of questions :
I'm planning on updating my bathroom.
There is paneling (48" high from the ground up) in my bathroom, around the sink area (but not in the tub area), which I want to remove and replace that with tiles.
I'm assuming that, when I remove the paneling from the drywall, it will damage the drywall.
Do I want to replace the drywall, if it get's damaged from removing the paneling, or do I replace the drywall with backerboard, regardless if it gets damaged or not ?

In the bathtub area, there are 3 fiberglass panels that surround the tub.
The look is a bit outdated, so I want to replace that with tiles.
After removal, can I just put up backerboard and tile over that ?

What adhesive to use for both projects ?

Thanks to all the people that take the time to answer these kind of questions on this Forum! I know you must heard these kind of questions a million times before...

Danny
__________________
Danny
----------------
Wake up and smell the coffee!
coffee4me is offline   Reply With Quote
Sponsored Links
Unread 08-26-2007, 07:18 AM   #2
TileArt1
Fort Collins, Colorado Tile & Stone Contractor
 
TileArt1's Avatar
 
Join Date: Apr 2007
Location: Fort Collins, Colorado
Posts: 2,733
Hi Danny,

Depending on how the paneling was attached, you may need to replace the drywall. If it is just attached with nails you should be able to remove it without damaging the drywall. If not, and the drywall needs to be replaced, you can just use regular drywall for it. There is really no need to use backerboard on a wainscot.

The best thing to do with your shower is to take it all the way down to the studs (up to the point you will be tiling) and replace it with a backerboard. (Don't forget a vapor-barrier)

Use just a regular modified thinset (powdered, not premixed) for both.
__________________
Roger (The FloorElf)

<img src=http://www.johnbridge.com/images/mod/jmg/TileArt1.png border=0 alt= />

Custom Tile & Stone installation
Fort Collins, Colorado

CTEF Certified Tile Installer #847

Social dysfunction can be traced to the abandonment of reason
TileArt1 is offline   Reply With Quote
Unread 08-26-2007, 09:05 AM   #3
coffee4me
Registered User
 
Join Date: Jul 2005
Posts: 26
Arrow

Thannk you for your reply...

I'm pretty sure the paneling is glued to the drywall. Hopefully it will come off easy.
If I understand it correctly, IF the drywall is still in good shape, I can just place my tiles on the drywall, right ?

For the bathtub area, attach vapor barrier onto the studs and backerboard over that ? Is there anything else that I need to do for prep work ?

Thank you
__________________
Danny
----------------
Wake up and smell the coffee!
coffee4me is offline   Reply With Quote
Unread 08-26-2007, 08:20 PM   #4
jadnashua
Veteran DIYer- Schluterville Graduate

STAR Senior Contributor

 
Join Date: Jul 2004
Location: Nashua, NH
Posts: 14,329
WHile you have the walls off in the tub area, you might look into either rebuilding or replacing the valve. I'm assuing the tub surround was not part of a one-piece tub enclosure. Your tub should have a tiling flange around it. Run the vapor barrier over the flange. Depending on the size of the tile, if that flange is high and the tile are small, you may want to shim the studs out so that the backer board can run down to within about 1/4" of the tub over the flange without bowing out. If the tile are big, you can stop it above the flange, but still make sure to lap the vapor barrier. Use some caulk in the gap.
__________________
Jim DeBruycker
Not a pro, multiple Schluter Workshops (Schluterville and 2013 and 2014 at Schluter Headquarters), Mapei Training 2014, Laticrete Workshop 2014, Custom Building Products Workshop 2015, and Longtime Forum Participant.
jadnashua is offline   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 11:21 PM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC