Ceramic Tile Advice Forums - John Bridge Ceramic Tile

Welcome to John Bridge / Tile Your World, the friendliest DIY Forum on the Internet


Advertiser Directory
JohnBridge.com Home
Buy John Bridge's Books

Go Back   Ceramic Tile Advice Forums - John Bridge Ceramic Tile > Tile & Stone Forums > Professionals' Hangout

Sponsors


Reply
Thread Tools Search this Thread
Unread 07-25-2003, 04:49 AM   #1
scott anthony
Tile Man -- Central Florida
 
scott anthony's Avatar
 
Join Date: Jan 2003
Location: marion county
Posts: 1,647
moving plywood seams

I have inspected a house yesterday and find the floor and support structure just fine. There is a lay of 3/4 ply on top of 2 x 8's. I noticed the ply is not T and G because a few of the seams can move when direct pressure is applied. The movement is about a 1/8. I know I need a backer but I want to keep it at a 1/4 do to the fact the cabinets are in already. Not my way of doing it there.
Short of cutting out and under scabbing the loose edges, does anyone have a more efficient method?
scott anthony is offline   Reply With Quote
Sponsored Links
Unread 07-25-2003, 05:32 AM   #2
bbcamp
Registered User
 
Join Date: Jul 2002
Posts: 30,274
Add blocking under the seams.
bbcamp is offline   Reply With Quote
Unread 07-25-2003, 08:54 AM   #3
Sonnie Layne
Da Poet
 
Join Date: Apr 2001
Location: Dallas, TX, USA
Posts: 5,171
Ditto,

attack it from under. If this isn't possible, get back. You'll get more ideas than you axed for
__________________
da' poet
Sonnie Layne is offline   Reply With Quote
Unread 07-25-2003, 07:03 PM   #4
Davy
Moderator -- Mud Man
 
Davy's Avatar
 
Join Date: Jan 2003
Location: Princeton,Tx.- Dallas area
Posts: 33,270
I like Bob's idea too.
Davy is offline   Reply With Quote
Unread 07-25-2003, 07:23 PM   #5
scott anthony
Tile Man -- Central Florida
 
scott anthony's Avatar
 
Join Date: Jan 2003
Location: marion county
Posts: 1,647
That would be too easy. The underside is all ceiling.
Do they make an epoxy that you can fill the seams with?
I know wood glue is stronger than wood itself. I just don't want to use something that might work. I have no problem cutting out a 4 x 8 an under screwing a 8 x 14.


I was just hoping for an easy way out.
scott anthony is offline   Reply With Quote
Unread 07-25-2003, 11:45 PM   #6
stullis
Flooring Installer
 
Join Date: Mar 2002
Location: Home of Sinclair Lewis, Sauk Centre, MN
Posts: 3,218
Thumbs down

2x8 floor joist not good single layer plywood that isn't T&G definitely not good... and you were saying that the floor and support structure is good?
stullis is offline   Reply With Quote
Unread 07-26-2003, 05:19 AM   #7
scott anthony
Tile Man -- Central Florida
 
scott anthony's Avatar
 
Join Date: Jan 2003
Location: marion county
Posts: 1,647
The structure supporting the ply is good. I do know the ply itself is the weak link. The ply is in very good shape other two slight movers. Removal is out of the Question and the hight comes into play.
Would you walk from this one?
scott anthony is offline   Reply With Quote
Unread 07-26-2003, 06:56 AM   #8
stullis
Flooring Installer
 
Join Date: Mar 2002
Location: Home of Sinclair Lewis, Sauk Centre, MN
Posts: 3,218
You either have to block the plywood seam joists from below as was suggested or put another layer of plywood down.

I would walk if the customer did not want to pay for bringing the floor up to needed specs.

You say there are only a couple of spots bad? Is it possible that they did use T&G but the tongue was bad on those couple of spots? Maybe you would only have to lift a sheet or two of plywood to repair. How big of an area is this and what is the span on the 2x8 joists?
__________________
Scott

Last edited by stullis; 07-26-2003 at 07:02 AM.
stullis is offline   Reply With Quote
Unread 07-26-2003, 03:57 PM   #9
scott anthony
Tile Man -- Central Florida
 
scott anthony's Avatar
 
Join Date: Jan 2003
Location: marion county
Posts: 1,647
The 2 x 8 s are at 16" and are supported directly through the middle of this simple 180 Ftr.
I can block it from underside but I am not going to rip apart their house to do so.
The way I would do this is as I explained prev--- screw a grab handle onto a 8 x 14 ply and glue and screw. I know it won't move any more. Or better yet cut out a 3x141/2 and attach a 2x6 onto the beams verticaly and also to the ply. I 'm not sure if your follwing me here.
There has to be a better way.


Thought: Rip at the seam of the 3/4 ply 7/8ths of the way through and use a wood bond of some sort that is stronger than the wood itself. This would leave a 1/8th cut line to fill.
And then the application of the backer would add extra support.
Them areas can be marked for extra screws.
scott anthony is offline   Reply With Quote
Unread 07-27-2003, 10:56 AM   #10
bbcamp
Registered User
 
Join Date: Jul 2002
Posts: 30,274
You won't be able to edge glue plywood.

Pull up one sheet and add blocking from the top.
bbcamp is offline   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 10:58 AM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC