Unread 04-22-2004, 05:51 PM   #1
rob 223
Registered User
 
Join Date: Mar 2004
Posts: 254
Broken marble over ply joints.

I had to tear out 15 feet of marble today thank god for the air chisel . Anywho 3/4 ply 1/4 cb tgi's 16 oc. and when I tore it up, 3yrs after installing it some of the cbu came up and I saw that all the cracked tiles were over the ply joints. Now my q is other than floating mud how could this be avoided? Also do you think its from expansion/contraction or raised or lowered joist? I dont know if this offers any clues but the marble cracks were very hard to see, only at a certain angle with the light just rite it looked almost like there was a divit or ditch along the cracks not raised or seperated but lowered which makes me think maybe the joist sank or was lower than the others almost all the broke peices were along 1 joist and it wasnt a continual line, as the ply was staggered so were the cracks.

BTW this work was done with and for my boss and to builders spec and I know there should have been a better subfloor but no one wants height differences between floors hence the 1/4 cbu
rob 223 is offline   Reply With Quote
Sponsored Links
Unread 04-22-2004, 07:09 PM   #2
Davestone
Florida Tile & Stone Man
 
Join Date: Apr 2004
Location: Naples Fl.
Posts: 22,690
Did you put a straight edge over problem area to see if it sank? You said cbu came up,by itself? was it just nailed?no thinset or screws?was the cbu joint over the ply joint?
__________________
Dave



http://Davestonestile.com
Davestone is offline   Reply With Quote
Unread 04-22-2004, 07:15 PM   #3
rob 223
Registered User
 
Join Date: Mar 2004
Posts: 254
The cbu was thinsetted and screwed and the cb joints were not over the ply joints. I didnt check with straight edge but I will tommorow.
rob 223 is offline   Reply With Quote
Unread 04-22-2004, 07:22 PM   #4
Davestone
Florida Tile & Stone Man
 
Join Date: Apr 2004
Location: Naples Fl.
Posts: 22,690
Strange,unless they'res a possibility the joist was weakened severely by plumbing or electrical notching enough to sink far enough to pull cbu with it. No water damage huh?
__________________
Dave



http://Davestonestile.com
Davestone is offline   Reply With Quote
Unread 04-22-2004, 07:26 PM   #5
Davestone
Florida Tile & Stone Man
 
Join Date: Apr 2004
Location: Naples Fl.
Posts: 22,690
Or maybe that joist was already low severely enough that cbu bridged over it forming a void and eventually gave way?!
__________________
Dave



http://Davestonestile.com
Davestone is offline   Reply With Quote
Unread 04-23-2004, 04:28 AM   #6
David Taylor
Registered User
 
David Taylor's Avatar
 
Join Date: Mar 2003
Location: NYC, NY/Edmonton, Canada
Posts: 1,207
Was there a gap between sheets of plywood before you put the CBU on?

You're still a little thin on the subfloor at less than 1".
__________________
The best result of a quality installation is a good night's sleep.

www.tile-experts.com -- Get Schluter products, like DITRA and KERDI, plus live help!
David Taylor is offline   Reply With Quote
Unread 04-23-2004, 05:39 AM   #7
bbcamp
Registered User
 
Join Date: Jul 2002
Posts: 30,274
I think that stone needs double wood subfloors, regardless of the underlayment. Minimum subfloor thickness is 1-1/4"
bbcamp is offline   Reply With Quote
Unread 04-23-2004, 04:08 PM   #8
rob 223
Registered User
 
Join Date: Mar 2004
Posts: 254
some of the joints in the plywood were gaped some were smacked tight, also some of the marble joints were to tight I think, when tearing out some of the tile the ones next to it chiped. When I was removing the grout I coulnt even get the knife blade between the tiles. In one area 3 peices became 7 even though I was being as carefull as possible the joints were very tight in this area and were full of thinset. Anyway I am so glad to be done with that.
rob 223 is offline   Reply With Quote
Unread 04-23-2004, 04:29 PM   #9
John Bridge
Mudmeister
 
Join Date: Mar 2001
Location: Rosanky, Texas
Posts: 68,304
Send a message via AIM to John Bridge
I'm a mud man, of course, but I think double plywood would be the way to go, and certain folks are now thinking that the upper layer should not break over the joists at all. The butt joints should occur a third of the way across the joist space. Or is that a quarter of the way?
John Bridge is offline   Reply With Quote
Unread 04-23-2004, 04:46 PM   #10
David Taylor
Registered User
 
David Taylor's Avatar
 
Join Date: Mar 2003
Location: NYC, NY/Edmonton, Canada
Posts: 1,207
A quarter of the way, according to the good Doctor. He knows his stuff.
__________________
The best result of a quality installation is a good night's sleep.

www.tile-experts.com -- Get Schluter products, like DITRA and KERDI, plus live help!
David Taylor is offline   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 12:28 PM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC