My wife and I are redoing our bathroom. We thought we had the floor level when we put cement board down. But after we put the tub in we found a small gap were the tub meets the floor.
I thought we would be able to slide a small piece of 1/4 inch cement board under tub in the low spot and then mud everything level when we tiled. But we found out that it was going to take a lot of mud and it wasn't working out well.
I'm not sure how to proceed. Can I slide the piece of cement board under the tub on the low spot and then poor leveling cement around it to fill in the low spot on the rest of the floor?
I have included a picture that shows where the low spot is under the tub and in the middle of the floor. I out lined it with a line.
I'm sure we did everything wrong. Nothing has gone right in this remodel so far.
My wife and I are novices and probably should have hired a pro so please be nice!