Gentlemen, I come to you with a problem, AGAIN. In my hast to remove the CBU and install the plywood I missed a step.
I have a 2.5 ft x 2ft outcove where my toilet is that goes about 5/16 - 3/8" lower then the rest of the floor. Its a flat desent but 5/16-3/8" lower at the wall none the less. I had leveled this with the CBU in but then I ripped it up to add the 5/8" ply and forgot to address it.
Now the Ditra is down. (Im sick to my stomach again)....ANYHOW...is there any product that I could use over the Ditra to build up that 2ft x 2ft section up so the entire floor is flat? Any unmodified medium motars that I can use in that area to gain 5/16-3/8" so I can then put tile down.
Im sorry I am so dumb...I just figured this is still the best source for a valid solution. Im sure you will suggest ripping ditra up to level, but any suggestions are appreciated.
__________________
Scott
Last edited by awdpsi; 06-26-2014 at 10:59 PM.
Reason: ask better question
|