Ceramic Tile Advice Forums - John Bridge Ceramic Tile

Welcome to John Bridge / Tile Your World, the friendliest DIY Forum on the Internet


Advertiser Directory
JohnBridge.com Home
Buy John Bridge's Books

Go Back   Ceramic Tile Advice Forums - John Bridge Ceramic Tile > Tile & Stone Forums > Tile Forum/Advice Board

Sponsors


Reply
Thread Tools Search this Thread
Unread 10-22-2017, 04:15 PM   #1
ironmanbythirty
Registered User
 
Join Date: Sep 2012
Location: Grand Rapids, MI
Posts: 12
Home Addition with Master Suite & Shower

Hello everyone! We are in the middle of a home addition. We are adding a half bath along with a master suite. My plan all along has been to use the Kerdi Shower Kit (already purchased) in the master suite since I had such good luck with it during a bathroom remodel a few years back.

Framing is done and we are on to plumbing. The plumber did a walk through last week and is supposed to start Wednesday or Thursday this week. During his walkthrough, he said that it would be helpful to have the shower base and drain installed before plumbing is run. He has never worked with Kerdi and has no experience with it at all. Everything I have seen (at least so far) shows the installation of the shower base going in after drywall is in.

So, any advice? Do I:
A) Install the shower base up against the framing adding a (1/2"-1" to my overall dimensions to account for drywall on 3 sides) and then run the drywall down to the top of the base? (Not sure if the drywall should come to the top of the base but I guess if it is all waterproofed it may not matter)
B) Install the base 1/2" away from the framing and run the drywall alongside it when the time comes (seems like a bad idea as it will be harder to screw the drywall to the wall plate)
C) Push back with the plumber and have him just run plumbing to where I mark where the drain will eventually be. (Not sure on how precise this has to be and if will run into issues later)
D) Something I haven't thought of yet.

For reference, I am attaching a sketch of the bathroom layout (mostly to scale).
Attached Images
 
__________________
Kevin
ironmanbythirty is offline   Reply With Quote
Sponsored Links
Unread 10-22-2017, 05:27 PM   #2
rmckee84
Registered User
 
rmckee84's Avatar
 
Join Date: Feb 2012
Location: Southern Illinois
Posts: 3,016
Set the tray as close as possible to its final placement and mark the drain placement. Then have him stub up the 2" drain line so you can cut it off later and set your drain. I wouldn't want a plumber working over my foam pan. Mark what you need to then put the tray back in the box. He doesn't need it set to do anything, he just needs to know where the drain needs stubbed up.
__________________
Jack of most trades, master of none...
Ryan McKee
McKee Construction & Custom Tile
rmckee84 is offline   Reply With Quote
Unread 10-23-2017, 09:42 AM   #3
ironmanbythirty
Registered User
 
Join Date: Sep 2012
Location: Grand Rapids, MI
Posts: 12
Thank you very much Ryan! The plumber came highly recommended but I have to say it wasn't very settling when I showed him the Kerdi drain and shower tray and his response was "I've never seen this before". ha!
__________________
Kevin
ironmanbythirty is offline   Reply With Quote
Unread 10-23-2017, 10:02 AM   #4
cx
Moderator emeritus
 
cx's Avatar
 
Join Date: Jul 2001
Location: Boerne, Texas
Posts: 92,303
Kevin, there was a time for each of us when we'd never heard of a Kerdi Shower System before. Nor of any other direct bonded waterproofing membrane. Don't think too harshly of your plumber not having been exposed to such systems, 'specially if he's an old guy and works in an area where such products are not in common use.

Now, if he's unwilling to learn about the new systems, that's a different story.

My opinion; worth price charged.
__________________
CX

Y'ALL NEW VISITORS READ THIS HERE!
cx is online now   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Megan's Master Suite Remodel (Layout help) meganjo Tile Forum/Advice Board 8 05-15-2012 09:33 AM
Gregg's home addition / renovation Gregg2 Tile Forum/Advice Board 3 01-30-2012 05:56 AM
My Home Addition tilerite The Mud Box 160 10-27-2010 05:52 PM
Tiling a space that flows into the home addition .... Hair6a11 Tile Forum/Advice Board 4 02-25-2006 09:23 AM
Lundgren Master Suite Buried Tile Forum/Advice Board 66 10-09-2002 05:53 AM


All times are GMT -6. The time now is 12:36 PM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC