Unread 05-14-2007, 05:14 PM   #1
Tim K
Registered User
 
Join Date: Feb 2007
Location: central wy
Posts: 92
shower rebuild

Need some help. Redoing a shower that is 4'x6 1/2'. The old shower pan looks like it's made of quickcrete concrete. The liner is flat on the plywood, about 1 3/4" layer then wire lath, then aobut another 1 1/2" of concrete, all over a sunken wooden box. Shower is wheel chair accesable. I chilsed out about a 12" circle around the drain. Am planing to install kerdi drain and membrane. The adjoining bathroom floor is level with the shower floor, but there is only one layer of 3/4 over the joist. Will be putting in an heated tile floor with detra, so will be adding another layer of 5/8 over the existing 3/4. I want to keep the shower floor and bathroom floor the same height. The deflection is good, and the box is supported well. The tiles were installed on the walls and floor with what looks like mastic of some sort, which by the way, was realllllll easy to remove. got behind one, and about 3 or for others fell off. Long way to ask a question, but needed to get you some info first. The question is
1: can I lay a drypack over the existing shower pan? The old slop is good. Would be adding about 1" over the entire shower pan, then kerdi with their drain.
2: Would doing a skim coat of modified over the old pan before the mud pack help it stick? and is 1" too thin, and would it crack back out.
3: Or would it be best to take out the old pan and start over?
Tim K is offline   Reply With Quote
Sponsored Links
Unread 05-14-2007, 05:35 PM   #2
TileArt1
Fort Collins, Colorado Tile & Stone Contractor
 
TileArt1's Avatar
 
Join Date: Apr 2007
Location: Fort Collins, Colorado
Posts: 2,733
Hi Tim,

In my opinion, it is always better to tear everything out and start fresh. That being said, it is not necessary, just the way I prefer it.
If you do go over it, yes, skim coat it first. 1" is thick enough to be solid. This is providing, of course, that the present pan is good and solid. Your pan will only be as solid as what is beneath it.
__________________
Roger (The FloorElf)

<img src=http://www.johnbridge.com/images/mod/jmg/TileArt1.png border=0 alt= />

Custom Tile & Stone installation
Fort Collins, Colorado

CTEF Certified Tile Installer #847

Social dysfunction can be traced to the abandonment of reason
TileArt1 is offline   Reply With Quote
Unread 05-14-2007, 05:38 PM   #3
Tim K
Registered User
 
Join Date: Feb 2007
Location: central wy
Posts: 92
It is solid, took me almost 1 1/2 hours to air chisle around the drain. I am leaning toward tearing out the whole thing, but am looking at almost another day in tear out. The concrete is REALLY hard. Thanks for the advise.
Tim K is offline   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 07:48 PM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2023, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC