Ceramic Tile Advice Forums - John Bridge Ceramic Tile

Welcome to John Bridge / Tile Your World, the friendliest DIY Forum on the Internet


Advertiser Directory
JohnBridge.com Home
Buy John Bridge's Books

Go Back   Ceramic Tile Advice Forums - John Bridge Ceramic Tile > Tile & Stone Forums > Tile Forum/Advice Board

Sponsors


Reply
Thread Tools Search this Thread
Unread 03-02-2003, 03:51 PM   #1
tada
Registered User
 
Join Date: Feb 2003
Location: Tucson, AZ
Posts: 20
Question Shower questions w/pics

I apologize in advance for the long post.

I am well into a bathroom remodeling project, and I thank you for all of the advice so far. Here is a pic of my shower stall:



and here is a closer pic of the shower floor:



I hope these post, I may not have done them right. Also, I apologize for the state of my bath, but hey - I have to start somewhere.

I have moved all the plumbing to the appropriate places, built a frame and installed a jetted tub, now on to the shower.

My wife wants the deck of the tub extended into the shower area for a box like shower seat. I would have love to gone John's whay with a corner seat, but the large vent tube kind of prevents that. The shower will extend out to where the 2x4 is placed on the floor. The HVAC vent prevents it from going out any farther.

So, If I may, I have some questions.

1. I'm going to need to add some more framing to accomodate a drywall/CBU seam. How far past the point of where the shower glass will go do you extend the tile? I'm using 4x4 tumbled marble (I know, I know - marble - but I have a wife!). And how far do I extend the CBU towards the curb?

2. How do I join CBU to drywall, and do I need to have a stud behind where I join them?

3. I want to tile to the sealing, but do I destroy my current drywall wall to ceiling joints, or do I cut the drywall down so far and join it to CBU?

4. If I use "frameless" glass shower doors and half wall, do I attach the channel to the CBU before tiling or to the finished tile?

These are all the questions I could think of a the moment, but as I keep progressing I know more will arise.

I would appreciate your help.

Thanks,

Tom
tada is offline   Reply With Quote
Sponsored Links
Unread 03-02-2003, 05:58 PM   #2
John Bridge
Mudmeister
 
Join Date: Mar 2001
Location: Rosanky, Texas
Posts: 68,970
Send a message via AIM to John Bridge
Hi Tom,

The biggest issue will be getting the seat waterproofed, but we'll get to that.

You could run CBUs up to about the shower head and then continue on with drywall. It'll never get wet up that high.

Yes, you do need backing behind the vertical joint of the CBU and sheetrock.

The shower door/enclosure is attached on top of the tile installation. It will be the final thing.
John Bridge is online now   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 05:12 PM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2023, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC