Ceramic Tile Advice Forums - John Bridge Ceramic Tile

Welcome to John Bridge / Tile Your World, the friendliest DIY Forum on the Internet


Advertiser Directory
JohnBridge.com Home
Buy John Bridge's Books

Go Back   Ceramic Tile Advice Forums - John Bridge Ceramic Tile > Tile & Stone Forums > Tile Forum/Advice Board

Sponsors


Reply
Thread Tools Search this Thread
Unread 06-16-2013, 05:35 PM   #16
jgleason
Retired Moderator - Theatre Guy (and computers)
 
jgleason's Avatar
 
Join Date: Mar 2004
Location: Weare, NH
Posts: 8,916
Hi Nick,
I merged your two threads back into one. We like to have one thread per project. One of the moderators can rename the thread to something , more generic if you like.
jgleason is offline   Reply With Quote
Unread 06-16-2013, 05:53 PM   #17
SECBuilders
Nick
 
Join Date: May 2013
Location: San Luis Obispo, CA
Posts: 22
Hey Joe,

No problem. Thanks for the heads up.

Drywall wouldn't be a bad idea... sure is cheap, and it'll be easy to get in there. Maybe that's the ticket... it won't be exposed to any form of moisture -- hmmmmmmm. I could give it a quick scratch coat with some thinset too.
__________________
Nick
SECBuilders is offline   Reply With Quote
Unread 06-16-2013, 05:56 PM   #18
SECBuilders
Nick
 
Join Date: May 2013
Location: San Luis Obispo, CA
Posts: 22
On second thought Joe, would you mind renaming the thread to "Kerdi Line Drain Remodel Questions"?

I haven't taken too many photos yet. The attached image is of the concrete pour after plumbing in the 2" drain line.
Attached Images
 
__________________
Nick
SECBuilders is offline   Reply With Quote
Unread 06-16-2013, 06:40 PM   #19
Screw Loose
Thinset on my fingers
 
Screw Loose's Avatar
 
Join Date: Oct 2011
Location: Xenia Ohio
Posts: 213
I just want to say that I like the foresight you have shown there, by having that 4" sleeve pipe around your 2" drain line.

Lot easier to have a big sleeve pulled out, then to be chipping out cement.
__________________
Christian

Blog of some of my works
Screw Loose is offline   Reply With Quote
Unread 06-16-2013, 07:04 PM   #20
SECBuilders
Nick
 
Join Date: May 2013
Location: San Luis Obispo, CA
Posts: 22
Thanks. These line drains can be a pain -- you'll want a little wiggle room for when you get to the fine tuning stage. This particular unit is stainless steel and sits on top of the slab (since that photo was taken, I did a thin coat of gypsum concrete to make everything smooth).

The hard part is (which is why I was asking about furring the wall) is getting the finished wall thickness dialed in exactly enough to get the line drain's grate spanning the finished width of the shower stall.

We'll see! I'll post some photos as soon as I can after I finish mudding all of the sheetrock work tomorrow.
__________________
Nick
SECBuilders is offline   Reply With Quote
Unread 06-16-2013, 07:27 PM   #21
Houston Remodeler
Pondering retirement daily

STAR Senior Contributor

 
Houston Remodeler's Avatar
 
Join Date: Oct 2009
Location: Houston Texas
Posts: 28,236
We usually plan one inch between the studs and the drain grate unless your tiles are unusually thick.
__________________
Paul1

For when DIY isn't such a good idea...
Houston TX area Kitchen & Bath Remodeling


http://CabotAndRowe.com
Houston Remodeler is offline   Reply With Quote
Unread 06-18-2013, 01:58 PM   #22
SECBuilders
Nick
 
Join Date: May 2013
Location: San Luis Obispo, CA
Posts: 22
I might be stuck with an inch and a quarter with the way the schlueter bonding flange works.

These suckers are hard. No second chances.
__________________
Nick
SECBuilders is offline   Reply With Quote
Unread 06-18-2013, 02:49 PM   #23
dhagin
builder, anti-builder, rebuilder -- Retired Moderator
 
Join Date: Mar 2009
Location: oahu
Posts: 13,165
The Kerdi Drain flange can be cut if necessary.
__________________
dana

"the road to hell is paved with osb, mastic, pre-mixed latex 'grout' or 'thinset', "
dhagin is offline   Reply With Quote
Unread 06-18-2013, 02:57 PM   #24
jadnashua
Veteran DIYer- Schluterville Graduate

STAR Senior Contributor

 
Join Date: Jul 2004
Location: Nashua, NH
Posts: 15,419
If you go with drywall, then the Kerdiboard...one trick they showed us at a Schluter workshop was to set the Kerdiboard as if it was one large tile using the spotting method. If you're not familiar with that, you put gobs of thinset in piles around the board's back, then push it up against the wall. They suggested using a long level for two purposes - getting the thing set perfectly plumb and to ensure you're pressing it and keeping it straight so as not to get a wavy surface.
__________________
Jim DeBruycker
Not a pro, multiple Schluter Workshops (Schluterville and 2013 and 2014 at Schluter Headquarters), Mapei Training 2014, Laticrete Workshop 2014, Custom Building Products Workshop 2015, and Longtime Forum Participant.
jadnashua is online now   Reply With Quote
Unread 06-18-2013, 06:32 PM   #25
SECBuilders
Nick
 
Join Date: May 2013
Location: San Luis Obispo, CA
Posts: 22
Good tip! I ended up using 3/4" OSB to get the depth I needed. Worked fine, and flattened things nicely. Should have the stall done tomorrow and I hope to float the floor in the afternoon.

I did find that the bonding flange and foam support can be a pain to get to stick to each other regardless of how much thinset you use.Name:  ImageUploadedByTapatalk1371601896.475004.jpg
Views: 204
Size:  29.3 KBName:  ImageUploadedByTapatalk1371601917.993547.jpg
Views: 210
Size:  24.6 KB

My mobile job site trailer for kicks
Name:  ImageUploadedByTapatalk1371601941.445448.jpg
Views: 215
Size:  64.7 KB
__________________
Nick

Last edited by SECBuilders; 06-18-2013 at 06:56 PM. Reason: Spelling
SECBuilders is offline   Reply With Quote
Unread 06-19-2013, 06:10 AM   #26
Lakee911
Registered User
 
Join Date: Apr 2006
Location: Lexington, KY
Posts: 1,054
Nice setup! I wish that I could be that organized. How do you like that Festool dust extractor? I've got some of their tools--and I love them--but the dust extractor is a bit spendy for me.
Lakee911 is offline   Reply With Quote
Unread 06-19-2013, 06:25 AM   #27
jondon
Hershey Pennsylvania Tile Contractor
 
jondon's Avatar
 
Join Date: Dec 2008
Location: Annville - Pennsylvania
Posts: 6,180
Send a message via AIM to jondon
Damn Nick nice storage
__________________

Jon Donmoyer

JD Tile

CTEF Certified Installer #825

Custom Tile Installation in Hershey & surrounding areas

Serving Dauphin, Lebanon, Berks, Chester, & Montgomery Counties PA
jondon is offline   Reply With Quote
Unread 06-19-2013, 04:27 PM   #28
jadnashua
Veteran DIYer- Schluterville Graduate

STAR Senior Contributor

 
Join Date: Jul 2004
Location: Nashua, NH
Posts: 15,419
If you're having trouble getting Kerdi to stick to the foam, you're either not using the right thinset, letting it skin over, or mixing it too stiff. It should be closer to mayonnaise verses peanut butter...still stiff enough to hold a notch, but very creamy - no need to use 'extra' water, but use the upper end of the thinset's allowable amount, and, mix it long enough. Most people do not mix it per the instructions...the speed, type of paddle, and time really makes a HUGE difference in the texture and consistency of thinset. It takes awhile to get all of the cement to get wetted and surround the fillers evenly and effectively. A timer can make a big difference!

Properly mixed with thinset, and the Kerdi acts almost like contact glue when it comes in contact...it almost immediately gets the fleece saturated once you apply any pressure at all.
__________________
Jim DeBruycker
Not a pro, multiple Schluter Workshops (Schluterville and 2013 and 2014 at Schluter Headquarters), Mapei Training 2014, Laticrete Workshop 2014, Custom Building Products Workshop 2015, and Longtime Forum Participant.
jadnashua is online now   Reply With Quote
Unread 06-19-2013, 04:57 PM   #29
SECBuilders
Nick
 
Join Date: May 2013
Location: San Luis Obispo, CA
Posts: 22
I totally agree. In this case, it was foam to cement slab -- the drain itself had a little spring to it and it was causing the foam drain pan to bulge a bit. Fixed it after the kerabond set up a little more.

Enclosure is done. Spent the rest of the day installing a window.

Name:  ImageUploadedByTapatalk1371682579.259825.jpg
Views: 194
Size:  40.3 KB

Tomorrow I'll float the floor. I plan on back sloping the float by the drain for any water that escapes.
__________________
Nick
SECBuilders is offline   Reply With Quote
Unread 06-19-2013, 05:06 PM   #30
Tiger Mountain Tile Inc
Registered Muser
 
Tiger Mountain Tile Inc's Avatar
 
Join Date: Feb 2011
Location: Issaquah, Washington
Posts: 7,461
Nice. I just wonder about how a door would work with the drain in that location if you back slope the outside.

edit: Nice trailer too.
__________________
James Upton
How-to mix a small batch of thinset perfectly, every time.
Tiger Mountain Tile Inc is online now   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
need kerdi line drain dave on his knees Professionals' Hangout 10 05-31-2013 10:30 AM
Bathroom Remodel - Drain Questions sclark Tile Forum/Advice Board 32 05-19-2012 02:40 PM
Kerdi Line drain question Lethe Tile Forum/Advice Board 3 02-04-2012 05:56 PM
Kerdi remodel drain johntrent Professionals' Hangout 8 11-07-2009 01:14 PM
using a kerdi drain in a remodel BrendaS1 Tile Forum/Advice Board 28 07-03-2009 07:54 AM


All times are GMT -6. The time now is 07:30 PM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2023, Jelsoft Enterprises Ltd.
Copyright 2018 John Bridge & Associates, LLC