Hi Nick,
I merged your two threads back into one. We like to have one thread per project. One of the moderators can rename the thread to something , more generic if you like.
|
|
|
06-16-2013, 05:53 PM
|
#17
|
Nick
Join Date: May 2013
Location: San Luis Obispo, CA
Posts: 22
|
Hey Joe,
No problem. Thanks for the heads up.
Drywall wouldn't be a bad idea... sure is cheap, and it'll be easy to get in there. Maybe that's the ticket... it won't be exposed to any form of moisture -- hmmmmmmm. I could give it a quick scratch coat with some thinset too.
__________________
Nick
|
|
|
06-16-2013, 05:56 PM
|
#18
|
Nick
Join Date: May 2013
Location: San Luis Obispo, CA
Posts: 22
|
On second thought Joe, would you mind renaming the thread to "Kerdi Line Drain Remodel Questions"?
I haven't taken too many photos yet. The attached image is of the concrete pour after plumbing in the 2" drain line.
__________________
Nick
|
|
|
06-16-2013, 06:40 PM
|
#19
|
Thinset on my fingers
Join Date: Oct 2011
Location: Xenia Ohio
Posts: 213
|
I just want to say that I like the foresight you have shown there, by having that 4" sleeve pipe around your 2" drain line.
Lot easier to have a big sleeve pulled out, then to be chipping out cement.
|
|
|
06-16-2013, 07:04 PM
|
#20
|
Nick
Join Date: May 2013
Location: San Luis Obispo, CA
Posts: 22
|
Thanks. These line drains can be a pain -- you'll want a little wiggle room for when you get to the fine tuning stage. This particular unit is stainless steel and sits on top of the slab (since that photo was taken, I did a thin coat of gypsum concrete to make everything smooth).
The hard part is (which is why I was asking about furring the wall) is getting the finished wall thickness dialed in exactly enough to get the line drain's grate spanning the finished width of the shower stall.
We'll see! I'll post some photos as soon as I can after I finish mudding all of the sheetrock work tomorrow.
__________________
Nick
|
|
|
06-16-2013, 07:27 PM
|
#21
|
Pondering retirement daily
Senior Contributor
Join Date: Oct 2009
Location: Houston Texas
Posts: 28,236
|
We usually plan one inch between the studs and the drain grate unless your tiles are unusually thick.
__________________
Paul 1
For when DIY isn't such a good idea...
Houston TX area Kitchen & Bath Remodeling

http://CabotAndRowe.com
|
|
|
06-18-2013, 01:58 PM
|
#22
|
Nick
Join Date: May 2013
Location: San Luis Obispo, CA
Posts: 22
|
I might be stuck with an inch and a quarter with the way the schlueter bonding flange works.
These suckers are hard. No second chances.
__________________
Nick
|
|
|
06-18-2013, 02:49 PM
|
#23
|
builder, anti-builder, rebuilder -- Retired Moderator
Join Date: Mar 2009
Location: oahu
Posts: 13,165
|
The Kerdi Drain flange can be cut if necessary.
__________________
dana
"the road to hell is paved with osb, mastic, pre-mixed latex 'grout' or 'thinset', "
|
|
|
06-18-2013, 02:57 PM
|
#24
|
Veteran DIYer- Schluterville Graduate
Senior Contributor
Join Date: Jul 2004
Location: Nashua, NH
Posts: 15,419
|
If you go with drywall, then the Kerdiboard...one trick they showed us at a Schluter workshop was to set the Kerdiboard as if it was one large tile using the spotting method. If you're not familiar with that, you put gobs of thinset in piles around the board's back, then push it up against the wall. They suggested using a long level for two purposes - getting the thing set perfectly plumb and to ensure you're pressing it and keeping it straight so as not to get a wavy surface.
__________________
Jim DeBruycker
Not a pro, multiple Schluter Workshops (Schluterville and 2013 and 2014 at Schluter Headquarters), Mapei Training 2014, Laticrete Workshop 2014, Custom Building Products Workshop 2015, and Longtime Forum Participant.
|
|
|
06-18-2013, 06:32 PM
|
#25
|
Nick
Join Date: May 2013
Location: San Luis Obispo, CA
Posts: 22
|
Good tip! I ended up using 3/4" OSB to get the depth I needed. Worked fine, and flattened things nicely. Should have the stall done tomorrow and I hope to float the floor in the afternoon.
I did find that the bonding flange and foam support can be a pain to get to stick to each other regardless of how much thinset you use. 
My mobile job site trailer for kicks
__________________
Nick
Last edited by SECBuilders; 06-18-2013 at 06:56 PM.
Reason: Spelling
|
|
|
06-19-2013, 06:10 AM
|
#26
|
Registered User
Join Date: Apr 2006
Location: Lexington, KY
Posts: 1,054
|
Nice setup! I wish that I could be that organized. How do you like that Festool dust extractor? I've got some of their tools--and I love them--but the dust extractor is a bit spendy for me.
|
|
|
06-19-2013, 06:25 AM
|
#27
|
Hershey Pennsylvania Tile Contractor
Join Date: Dec 2008
Location: Annville - Pennsylvania
Posts: 6,180
|
Damn Nick nice storage
|
|
|
06-19-2013, 04:27 PM
|
#28
|
Veteran DIYer- Schluterville Graduate
Senior Contributor
Join Date: Jul 2004
Location: Nashua, NH
Posts: 15,419
|
If you're having trouble getting Kerdi to stick to the foam, you're either not using the right thinset, letting it skin over, or mixing it too stiff. It should be closer to mayonnaise verses peanut butter...still stiff enough to hold a notch, but very creamy - no need to use 'extra' water, but use the upper end of the thinset's allowable amount, and, mix it long enough. Most people do not mix it per the instructions...the speed, type of paddle, and time really makes a HUGE difference in the texture and consistency of thinset. It takes awhile to get all of the cement to get wetted and surround the fillers evenly and effectively. A timer can make a big difference!
Properly mixed with thinset, and the Kerdi acts almost like contact glue when it comes in contact...it almost immediately gets the fleece saturated once you apply any pressure at all.
__________________
Jim DeBruycker
Not a pro, multiple Schluter Workshops (Schluterville and 2013 and 2014 at Schluter Headquarters), Mapei Training 2014, Laticrete Workshop 2014, Custom Building Products Workshop 2015, and Longtime Forum Participant.
|
|
|
06-19-2013, 04:57 PM
|
#29
|
Nick
Join Date: May 2013
Location: San Luis Obispo, CA
Posts: 22
|
I totally agree. In this case, it was foam to cement slab -- the drain itself had a little spring to it and it was causing the foam drain pan to bulge a bit. Fixed it after the kerabond set up a little more.
Enclosure is done. Spent the rest of the day installing a window.
Tomorrow I'll float the floor. I plan on back sloping the float by the drain for any water that escapes.
__________________
Nick
|
|
|
06-19-2013, 05:06 PM
|
#30
|
Registered Muser
Join Date: Feb 2011
Location: Issaquah, Washington
Posts: 7,461
|
Nice. I just wonder about how a door would work with the drain in that location if you back slope the outside.
edit: Nice trailer too.
|
|
|
 |
|
 
 
Thread Tools |
Search this Thread |
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 07:30 PM.
|
|
|