|
Sponsors |
|
|
 |
|
01-17-2010, 07:43 PM
|
#1
|
CSC
Join Date: May 2009
Location: Minneapolis, Minnesota
Posts: 588
|
Luke's Bath Remodel
This is how I do a shower pan. I'm sure it breaks some rules, but the inspectors are okay with it. Posting it here to see if you guys approve.
I start by cutting 1" wide strips of 1/2" Hardie and back buttering them, then I put them around the perimeter of the shower and I nail them down.
Then I spread thinset over the entire area, from 1/2" thick on the edges down to regularly troweled thickness in the center.
Then I measure for the drain and transfer the measurements to....
__________________
-Luke
Quality Crapsmanship.
In love with liquids.
|
|
|
01-17-2010, 07:47 PM
|
#2
|
CSC
Join Date: May 2009
Location: Minneapolis, Minnesota
Posts: 588
|
A piece of backer!
Then I cut the backer and back butter it and squish it into the thinset. I then nail around the edges and around the drain, and tape my joints.
__________________
-Luke
Quality Crapsmanship.
In love with liquids.
|
|
|
01-17-2010, 07:52 PM
|
#3
|
CSC
Join Date: May 2009
Location: Minneapolis, Minnesota
Posts: 588
|
Then I check it out, I have the 1/4" per foot of required slope(actually a little better).
EDIT: I attempted to switch the order of these two pics, but was unable...
__________________
-Luke
Quality Crapsmanship.
In love with liquids.
Last edited by coping skills; 01-17-2010 at 07:54 PM.
Reason: BLAH
|
|
|
01-17-2010, 07:55 PM
|
#4
|
CSC
Join Date: May 2009
Location: Minneapolis, Minnesota
Posts: 588
|
After this I will use a liquid waterproofing membrane, flood test, get it inspected and then put on another layer of hardie, and tile and what-not.
__________________
-Luke
Quality Crapsmanship.
In love with liquids.
|
|
|
01-17-2010, 07:59 PM
|
#5
|
Moderator -- Mud Man
Join Date: Jan 2003
Location: Princeton,Tx.- Dallas area
Posts: 33,210
|
My opinion, I don't like it. Cement boards are designed to be anchored down, not just thinsetted. You're a tileman, tilemen mix cement, or should. 5 bucks worth of cement and 20-30 minutes would have done the same thing but better.
You're gonna put another layer of Hardi over the pan?
|
|
|
01-17-2010, 08:24 PM
|
#6
|
Member of Million SF Club!!
Join Date: Oct 2002
Location: Ohio
Posts: 2,648
|
Oh Boy!
Your log-in explains your methods, Coping Skills
I have seen that done with plywood for a preslope only but never a whole shower.
Quote:
After this I will use a liquid waterproofing membrane, flood test, get it inspected and then put on another layer of hardie, and tile and what-not.
|
__________________
Kevin
|
|
|
01-17-2010, 08:35 PM
|
#7
|
Tampa Florida Tile Contractor
Join Date: Oct 2007
Location: Tampa, Florida
Posts: 26,465
|
yeah, and what-not
__________________
Brian
........
..........Tampa Florida Tile Installation
..............^^--Check out our Blog--^^
Tampa, Florida installer of Schluter Kerdi/Kerdiboard waterproofed showers
Tampa, Florida installer of Laticrete HydroBan/HydroBan board waterproofed showers
|
|
|
01-17-2010, 08:37 PM
|
#8
|
CSC
Join Date: May 2009
Location: Minneapolis, Minnesota
Posts: 588
|
Yes, I will put another layer or backer over the membrane so the pan will meet up with the top of the 3-piece drain.
Davy, I am not necessarily a tile man. One of sorts, but I work in all areas of construction/remodeling. The backer is mechanically fastened, but only on the edges and near the center.
Don't like it, eh?
__________________
-Luke
Quality Crapsmanship.
In love with liquids.
|
|
|
01-17-2010, 08:56 PM
|
#9
|
Tile Contractor Nashville, TN
Join Date: Mar 2007
Location: Joelton, TN
Posts: 4,163
|
I vote to cut this out and discuss under the title of "Hardi Shower Pan".
__________________
Brad

|
|
|
01-17-2010, 09:26 PM
|
#10
|
Tile Contractor Nashville, TN
Join Date: Mar 2007
Location: Joelton, TN
Posts: 4,163
|
We know this is improper. Let's show why for those that may come along with the same situation. Luke came to the right place to learn a few things, we all gotta start somewhere.
__________________
Brad

|
|
|
01-17-2010, 09:27 PM
|
#11
|
CSC
Join Date: May 2009
Location: Minneapolis, Minnesota
Posts: 588
|
How do I go about doing that?
__________________
-Luke
Quality Crapsmanship.
In love with liquids.
|
|
|
01-17-2010, 09:31 PM
|
#12
|
South East PA Tile Contractor
Join Date: Aug 2004
Location: Delaware County, PA
Posts: 6,584
|
__________________
-Derrick
***New Here?? Click here to add your name to your signature***
Check out my Blog and see my latest tiling projects!
Specializing in Kerdi Showers
|
|
|
01-17-2010, 09:40 PM
|
#13
|
Registered User
Join Date: Sep 2008
Location: Snohomish, WA
Posts: 3,098
|
Ya Luke not a good set up at all. that second layer of hardi is gonna be saturated all of its life and really gonna be a breding ground for mold. IMHO it dont matter what the inspectors think cause Ive never met one who "truely" understood the principles behind a properly built shower.
Couple questions,
*How are you treating the wall to pan connection?
*What is being done at the weeps?
*Why, without any proper knowledge of shower construction are you selling a client a shower built in this manner, Or is this your own home?
__________________
Jeremy
Cascade Tileworks,llc
Licensed, Bonded & Insured
WA Lic# CASCATL894QA
|
|
|
01-17-2010, 09:42 PM
|
#14
|
CSC
Join Date: May 2009
Location: Minneapolis, Minnesota
Posts: 588
|
No Rick, how do I go about moving it?
I named it the Hackbacker pan for a reason; I am aware that most would consider me to be a hack.
EDIT: Yes, this is my home. I would not be able to, in good conscience, sell someone something I had not done at least a couple times before. I asked the inspector about it before I decided to do it.
I am putting hardi down to the pan and taping the corners, then painting on a membrane.
EDIT: Leaving the weep holes open.
__________________
-Luke
Quality Crapsmanship.
In love with liquids.
Last edited by coping skills; 01-17-2010 at 09:48 PM.
|
|
|
01-17-2010, 09:42 PM
|
#15
|
Tile Contractor Nashville, TN
Join Date: Mar 2007
Location: Joelton, TN
Posts: 4,163
|
Oh, BTW Luke. Don't go anywhere. This may get ugly, but we all want a successful install for you and your customers. Remember that. 
I have asked cx to chop this out. Moderator hasta do it.
__________________
Brad

|
|
|
 |
|
 
 
Thread Tools |
Search this Thread |
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 06:43 PM.
|
|
|