Hello all,
Recent demo'd kids 5x8 bathroom. This is a tub/shower, everything will be replaced, membrane shower walls. Floors are OK for porcelain tile. I have some general and planning questions for now. Or questions I cant find clear answer on from months of searching.
1. Does the black parts of subfloor need replaced? If I poke with screw driver they are barely softer than other areas, but not mushy,etc. I will be installing Ditra and possibly second layer on 1/2" ply
2. According to videos and posts this is the waterproofing plan: I stop the drywall/CBU short of tub flange, caulk that gap. Then run a membrane product down over that and attach to tub with kerdifix,etc. Finally caulk gap between tile and tub. But if water gets behind tile, where is it going? Wouldn't it be the same theory as exterior trim and such you leave bottom open for water to run out?
3. Could you run kerdi band between the tub and floor transition to help with splashing out the tub? I dont see how this is possible since you would only have about 3/8" area where tile would hide it? Just trying to think of a way to help prevent against future water spilling out.
4. Previous tub was 30" wide. I was thinking of adding 32" tub since I have 18" to center toilet from previous tub. The joists run perpendicular to tub drain and are notched about 1" deep to accommodate. I would need to notch another inch or so over. Any problems with this or problems with upgrading size of tub?
5. Tub area is framed 60 1/2". Can I add shims to just the flange of tub to secure it or do I need to shim entire wall?
6. Still undecided about using drywall vs CBU for tub/shower area. If I was to use CBU how do I deal with the transition where drywall meets CBU? If it was taped and thinset, do you sand and paint thinset?
There will be more but that's it for now. Thanks!