 OKAY.... So, I need some advice y'all. I have a balcony that will be tiled in about 30 days after the concrete slab cures. The concrete geniuses have seemed to play a practical joke on me, and poured the ENTIRE 600ft2 area with an 1/8" per foot TOWARD the house...In the areas that don't have pitch/slope, it's perfectly level...GREAT! I have spoken with the builder, and having them back on the job site in any capacity is out of the question, including tearing it out. My plan WAS to have them pour 1" lower than grade and give myself the opportunity to use a mud bed, make my own pitch, and adjust the entire balcony structure to drain as necessary. so... now that is not an option due to height restriction at the entry doors... (seeing as how I can't build my bed thinner than 1") I need to do something else.
I am looking into grinding some of it down, but then i will still need to stay low. Has anyone used a product like Plani-patch or Lati-patch to achieve something like this before? what about thin-setting backer boards at different heights and "floating" or feathering mud around them? does anyone know of a floor leveler that can be used for outdoor use that is approved for thermal shock? If so, can I mix it thicker than the manufacturer's recommendations and screed it? This sucks!
__________________
ya jus' gon have that on them big jobs!
Jon
|
|
|
01-08-2015, 10:21 PM
|
#2
|
Moderator
Join Date: Nov 2006
Location: NW Arkansas, Ozark Mountains
Posts: 11,778
|
Is this a balcony or a patio? From your description it sounds more like a patio.
How much space do you have between the ground (current slab notwithstanding) and the threshold?
__________________
Kevin
The top ten reasons to procrastinate:
1.
|
|
|
01-08-2015, 10:54 PM
|
#3
|
Pondering retirement daily
Senior Contributor
Join Date: Oct 2009
Location: Houston Texas
Posts: 28,214
|
Option 1- Get a few estimates to have someone grind the slab down. Give those estimates to the builder.
Option 2- Run !
__________________
Paul 1
For when DIY isn't such a good idea...
Houston TX area Kitchen & Bath Remodeling

http://CabotAndRowe.com
|
|
|
01-08-2015, 11:04 PM
|
#4
|
Registered User
Join Date: Jan 2015
Location: Columbia, South Carolina
Posts: 8
|
yes it is a balcony. I am 16 ft off the ground. the slab is poured into a pan that is constructed if I-beams and metal plating. from the slab at the current height i have 3" to the threshold.. exactly 1 brick thickness
__________________
ya jus' gon have that on them big jobs!
Jon
|
|
|
01-08-2015, 11:07 PM
|
#5
|
Moderator emeritus
Join Date: Jul 2001
Location: Boerne, Texas
Posts: 92,216
|
Welcome, jontillman. Please put a first name in your permanent signature line for us to use.
I think Paul got the items pretty close, but maybe in the wrong order.
I think you should simply ask the GC how he intends to have the slab properly prepared for the tile installation. If he wants something done that you're willing to contract for, do that. If not, I think you'd make your best money on that job by saying "No, thank you."
My opinion; worth price charged.
|
|
|
01-08-2015, 11:17 PM
|
#6
|
Registered User
Join Date: Jan 2015
Location: Columbia, South Carolina
Posts: 8
|
Thanks cx! i really would like to find another solution if possible, or at least entertain the idea of one. the good news is that i have already laid almost 2700 ft2 of tile on this property already, and i have some time to make the builder make a move. if he has to grind it he will, but i was trying to find some other ideas, just because i feel bad for the guy... and i will not be warrantying this portion of the project seeing as how i will be unable to use the Ditra Drain system.... anything out of the box you can think of other than grinding?
__________________
ya jus' gon have that on them big jobs!
Jon
|
|
|
01-08-2015, 11:49 PM
|
#7
|
Moderator emeritus
Join Date: Jul 2001
Location: Boerne, Texas
Posts: 92,216
|
Quote:
Originally Posted by Jon
...and i will not be warrantying this portion of the project seeing as how i will be unable to use the Ditra Drain system....
|
If you tile it you will be warranting it, Jon. 'Specially if the surface is not brought to the proper slope of a minimum of 1/4" per foot away from the building and you know that and you tile it anyway.
You might wanna contact the folks at Laticrete and MAPEI about those products you mentioned and perhaps others.
You intend to waterproof the substrate when it's ready?
What's under the balcony?
|
|
|
01-09-2015, 07:09 AM
|
#8
|
Kitchen & Bath Remodeler Long Island
Join Date: Sep 2003
Location: Long Island, NY
Posts: 2,145
|
Quote:
from the slab at the current height i have 3" to the threshold.. exactly 1 brick thickness
|
Pay a laborer to slice 600 sqft of brick in half on a wet saw. The materials savings may offset the labor cost a little.
__________________
Alex
|
|
|
01-12-2015, 08:15 PM
|
#9
|
Registered User
Join Date: Jan 2015
Location: Columbia, South Carolina
Posts: 8
|
okay, here it is... this is what i'm up against
__________________
ya jus' gon have that on them big jobs!
Jon
|
|
|
01-12-2015, 08:24 PM
|
#10
|
Registered User
Join Date: Jan 2015
Location: Columbia, South Carolina
Posts: 8
|
I have talked to several other pros who i know do awesome work, and are knowledgeable, extremely skilled, and have more years of experience than myself, and i am getting a half and half answer. there are a some that say that stacking backer board to achieve height and feathering it out to nothing with a product such as lati-patch is acceptable, and that they have done it in the past, and there are some who say absolutely not, grind it or have it ground down. also, the builder has agreed to bring in a crew for the waterproofing, which he will warranty, not me.  ?????
__________________
ya jus' gon have that on them big jobs!
Jon
|
|
|
01-12-2015, 08:35 PM
|
#11
|
Moderator emeritus
Join Date: Jul 2001
Location: Boerne, Texas
Posts: 92,216
|
And how has the GC agreed to provide the necessary slope?
Quote:
Originally Posted by Jon
the builder has agreed to bring in a crew for the waterproofing, which he will warranty, not me.
|
Jon, we have had that same discussion here many, many times and the bottom line is always the same. You are expected to be the knowledgeable professional and if you tile over that deck you are acknowledging that everything under your tile is acceptable. If you should have a leak down the road and end up in a legal action, you can bet your financial statement that you'll be found to be at least partially liable.
|
|
|
01-12-2015, 09:05 PM
|
#12
|
Registered User
Join Date: Jan 2015
Location: Columbia, South Carolina
Posts: 8
|
yep.... and that sucks... ok... DECISION MADE.... i will have the builder tear it out or grind it down... also, CX what do you know about Protecto wrap?
__________________
ya jus' gon have that on them big jobs!
Jon
|
|
|
01-12-2015, 09:10 PM
|
#13
|
Moderator emeritus
Join Date: Jul 2001
Location: Boerne, Texas
Posts: 92,216
|
Very little. I know their anti-fracture membrane and know folks who have used it. About their other products I know nothing at all.
As with most products out there, type protecto into the Advanced Search feature and you'll find some discussion here.
|
|
|
01-12-2015, 09:17 PM
|
#14
|
Registered User
Join Date: Jan 2015
Location: Columbia, South Carolina
Posts: 8
|
cool. thanks bubba
__________________
ya jus' gon have that on them big jobs!
Jon
|
|
|
01-12-2015, 09:56 PM
|
#15
|
Pondering retirement daily
Senior Contributor
Join Date: Oct 2009
Location: Houston Texas
Posts: 28,214
|
Quote:
Originally Posted by CX
You are expected to be the knowledgeable professional and if you tile over that deck you are acknowledging that everything under your tile is acceptable. If you should have a leak down the road and end up in a legal action, you can bet your financial statement that you'll be found to be at least partially liable.
|
Especially if you sign some sort of document / waiver claiming the builder is responsible. Then you will have signed a legal document knowing its the wrong thing to do. That doesn't go well for you in court.
__________________
Paul 1
For when DIY isn't such a good idea...
Houston TX area Kitchen & Bath Remodeling

http://CabotAndRowe.com
|
|
|
 |
|
 
 
Thread Tools |
Search this Thread |
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 03:06 PM.
|
|
|