Off to Santa Rosa later on today to start a shower for a repeat client’s parent’s, been on the list of to do’s since they first saw my work in May of 2018 at their son’s guest house
Here was my reminder as to how lush I have it when I can struggle in a bathroom or floor with a stinking’ time consuming layout..
Job 1:
https://youtu.be/aOud2HRCiyU
Finish Plumbing into Equipment Set, Finish Main Line Trench to the Electrical access and run a Sleeve to the Equipment Area, Run a line for the Auto Fill, Drop off & Stage the Rebar for Caging and Tying tomorrow. Inspection for Rough-in is Friday, Gunite is scheduled pending inspection for 6:30 am Saturday
Job 2:
https://youtu.be/F3somwIKvjE
Form stripping and junk clean-up for haul-off. General site organization, wash down and hydrate gunite shell that was this from last Saturday. Awaiting material selections and delivery for all stone masonry and tile work. Backfilling and Rough Grading to start mid-next week. Hydrating is the KUSH job in Pool Building, like caulking for a tile guy