|
Sponsors |
|
|
 |
|
07-19-2009, 01:36 PM
|
#61
|
Registered User
Join Date: May 2009
Location: Artesia, MS
Posts: 138
|
Okay,
Corrected position of pics. Also, I recommend this table saw. A Dewalt , of course by the color, and it has been really reliable. It is one of the most stable table saws I have been around, portable that is. I have abused it for around 3 years now, and it has kept up with me. I just keep good sharp blades in it.
You can see where I supported the floor beneath the jacuzzi. The joists dead-ended at a header in front of the fireplace. Just a little insurance.
__________________
Joey
"Necessity is the plea for every infringement of human liberty; it is the argument of tyrants; it is the creed of slaves." William Pitt
|
|
|
07-19-2009, 01:41 PM
|
#62
|
Registered User
Join Date: May 2009
Location: Artesia, MS
Posts: 138
|
I wasn't thinking ahead on my seat/bench, and had my board too short. I took some mesh and nailed it in place, then pulled some wall-mud across it to finish it off.
__________________
Joey
"Necessity is the plea for every infringement of human liberty; it is the argument of tyrants; it is the creed of slaves." William Pitt
|
|
|
07-19-2009, 01:53 PM
|
#63
|
Registered User
Join Date: May 2009
Location: Artesia, MS
Posts: 138
|
My first Kerdi drain...I found my high-spot and used the height of my level - 2 1/4" - around the perimeter and made a level mark. I packed my screed to this mark, and pulled down to the drain. I used the Gueuzemeister method of deck-mud sandwiched between 254 Platinum (on the floor and on the flange). Oh, there is about 1 1/2" of mud under the flange. at least a 1/4" per ft. slope. And, all screws are 2" HDG, except I used Hardi screws for Hardi. I don't like those screws at all.
The wire is 1x1 galvanized welded-wire hardware cloth (drain is just sitting in hole).
You can see where I reinforced the plaster walls above the shower. I removed all loose plaster up through existing cracks. To get close back into existing wall elevation, I used 1/2" BC topped with 1/4" Hardi. There will be a 6" tile bacd around the top of the shower. I'll just pull hot-mud to patch. Oh yeah, the washers were roughened up on both sides and primed on the back. They were then screwed in through into the studs.
__________________
Joey
"Necessity is the plea for every infringement of human liberty; it is the argument of tyrants; it is the creed of slaves." William Pitt
|
|
|
07-19-2009, 02:01 PM
|
#64
|
Registered User
Join Date: May 2009
Location: Artesia, MS
Posts: 138
|
The problem I had with the Kerdi was mainly wrapping my outside corners. Like drywall tape, I had a few 'hollow' spots that I cut out, re-thinset, and then patched over them. Hopefully I did it right. Seemed logical. Also, I had to split my-preformed corners because they wanted to puff out. I just used some Kerdi-fix over them. Exspensive stuff!!! but, I like it.
I used a piece of Hardi as my table.
__________________
Joey
"Necessity is the plea for every infringement of human liberty; it is the argument of tyrants; it is the creed of slaves." William Pitt
|
|
|
07-19-2009, 02:06 PM
|
#65
|
Registered User
Join Date: May 2009
Location: Artesia, MS
Posts: 138
|
Pictures of completed Kerdi install.
You can see I almost cut the wrong hole...the mark is to the outside!!!, not the center!!! I shingled all my layers going up. I covered the floor with thick cardboard after finishing it.
__________________
Joey
"Necessity is the plea for every infringement of human liberty; it is the argument of tyrants; it is the creed of slaves." William Pitt
|
|
|
07-19-2009, 02:18 PM
|
#66
|
Registered User
Join Date: May 2009
Location: Artesia, MS
Posts: 138
|
This piece of Kerdi cut from one piece. Another picture of Kerdi fix and a small patch where knife slipped and point hit top of Kerdi. __it happens.
__________________
Joey
"Necessity is the plea for every infringement of human liberty; it is the argument of tyrants; it is the creed of slaves." William Pitt
|
|
|
07-19-2009, 07:31 PM
|
#67
|
Registered User
Join Date: Apr 2008
Location: Albany, NY
Posts: 8,612
|
Looking really good, Joey. But the only blue I see is the plastic electrical box.
gueuze
|
|
|
07-19-2009, 08:00 PM
|
#68
|
Bucket abuser
Join Date: Jan 2005
Location: Wildomar Ca
Posts: 9,177
|
I speak for myself when I say this, cause schluter doesn't reccomend it 
Next kerdi shower I do I am skipping the premade corners. I'll seam those
awkward corners with kerdi fix. Its good stuff. The only time I need kerdi
is for steam showers, so we'll see how soon that will be anyway, and will
I even remember ? lol.
|
|
|
07-19-2009, 09:14 PM
|
#69
|
Registered User
Join Date: May 2009
Location: Artesia, MS
Posts: 138
|
Yeah Gueuze, I installed the chameleon stuff.
Yeah Jack, those corners are a rascal. I agree with you on the Kerdi-fix. It is pretty amazing stuff. Sets up quickly too.
Gueuze, he was pretty rough on my floor, even though I layered it with corrugated paper. He through the stuff out after 2 days.
__________________
Joey
"Necessity is the plea for every infringement of human liberty; it is the argument of tyrants; it is the creed of slaves." William Pitt
|
|
|
 |
|
 
 
Thread Tools |
Search this Thread |
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 10:40 AM.
|
|
|