View Single Post
Unread 09-17-2008, 09:30 PM   #2
The Kid
Registered User
 
The Kid's Avatar
 
Join Date: Sep 2008
Location: Snohomish, WA
Posts: 3,098
If that was my job I would screw and glue 3/4" ply to studs screwed @ 8" on center. pre drill ply so as to suck up to studs. Then poly down to pan and cbu install per instructions over that. I would not worry about screws through poly. Make sure to hold the ply about 2 in. above the pan and run the cbu just short of the pan.
Just the way I would do it. Im sure others have many more ideas that would work as well.
The Kid is offline   Reply With Quote