CX, thanks for the reply..I really can not redo / tear this out. Firstly, it would take me a while based on my schedule and I also had to mix all 8 bags of floor mud 3 at a time / do the floor myself which is one of the reasons it dried up on me in some places..

Ideally, yes, that would be the best, what would be the second best option? Fill the left side of the floor with thinset and create the slope towards the drain?