View Single Post
Unread 02-12-2010, 03:01 PM   #4
Army1
Registered User
 
Join Date: Feb 2010
Location: Orlando, Florida
Posts: 16
That is what i was thinking. The edge height of the sloping mortar bed does not have to be even all the way around my frame box as long as i maintain a minimum of 1/4"/ft slope towards the base of the drain. Because of the location of the drain, the thickness of the sloping mortar bed will vary from 1/2" to 1-3/4". Once i install the membrane and pour the final mud floor, then i have to make sure the edge height is correct all the way around. Does this sound right? See attached file
Attached Images
 
__________________
Al
Army1 is offline   Reply With Quote