View Single Post
Unread 01-23-2019, 09:31 AM   #50
ss3964spd
Moderator
 
ss3964spd's Avatar
 
Join Date: Jul 2005
Location: Fairfax, Va
Posts: 2,653
Send a message via Yahoo to ss3964spd
I wouldn't think that there's be any adverse effects to the nails holding the sub floor boards to the joists by closing the gaps in the joists. Unless the gaps are huge I think closing them will only pull the nails sideways in their holes in the sub floor boards, and you're gonna want to screw those boards down anyway after the joist work is finished.

Seems to me the larger the gap between joists the more you rely on the diameter of the fastener to resist bending. May not matter though, if the fastener cannot draw the pair together at the top, and because of the joist depth finding a clamp with a deep enough throat will be tough, you may just have call it good enough.
__________________
Dan
---------------------------------------------------------------------------------
If I recall correctly my memory is excellent, but my ability to access it is intermittent.
ss3964spd is offline   Reply With Quote