View Single Post
Unread 10-01-2020, 06:57 AM   #7
MustangDave
MustangDave
 
Join Date: Sep 2020
Location: Philly Area
Posts: 4
Hey Dave. Thanks for the reply. Thinking about this a bit and I can see your point. Its the heating that would change the dynamic here.

One of the potential methods I was thinking about is to minimize the depth of mud between the joists, bring the mud up to the top of the joists, then put 3/4 Kerdi board screwed to the joists and bonded with thinset to the mud.

Any thoughts on something along these lines?
__________________
Dave
MustangDave is offline   Reply With Quote