pre-slope mortar bed problems

During the bathtub removal phase, I was unable to relocate drain from near the end wall (9 ") to a more central spot. As a result, the new drain base is not flushed with the concrete floor and it's off about 1/4 " on one side. Should i spread the mud evenly around the perimeter and compensate for the error by a change in slope (> 1/4 " per foot in some areas)? The area is 30X60. I don't want my final mortar bed to be affected by this error. Thanks