View Single Post
Unread 05-21-2012, 09:41 AM   #2
tilejoe
Registered User
 
tilejoe's Avatar
 
Join Date: Sep 2008
Location: Allentown, Bethlehem, Easton, PA
Posts: 2,302
That's weird. Get those furring strips out of there. Replace the ply directly onto the existing 3/4" subfloor. Place the new layer at the 1/4 point of tge joist bay. Screw every 6" with decker type screws, we use senco subfloor screws, do not use drywall screws. Also, no need to use glue, and don't screw the new layer of ply into the joists.
__________________
Joe Lenner

Infinite Ceramic & Stone
www.infiniteceramic.com
NTCA Pennsylvania State Rep
CTEF Certified Installer #769
tilejoe is offline   Reply With Quote