View Single Post
Unread 05-10-2022, 03:02 PM   #3
PC7060
...unrepentant, detail focused, over-analyzer.
 
PC7060's Avatar
 
Join Date: Jan 2013
Location: Virginia
Posts: 3,004
Finish details are typically non-inspection times by the code authorities. That is defined in the details of the contract which should specify material to be installed per manufacturer instructions and applicable trade specification (list in contract).
PC7060 is offline   Reply With Quote