View Single Post
Unread 07-26-2003, 06:56 AM   #8
stullis
Flooring Installer
 
Join Date: Mar 2002
Location: Home of Sinclair Lewis, Sauk Centre, MN
Posts: 3,218
You either have to block the plywood seam joists from below as was suggested or put another layer of plywood down.

I would walk if the customer did not want to pay for bringing the floor up to needed specs.

You say there are only a couple of spots bad? Is it possible that they did use T&G but the tongue was bad on those couple of spots? Maybe you would only have to lift a sheet or two of plywood to repair. How big of an area is this and what is the span on the 2x8 joists?
__________________
Scott

Last edited by stullis; 07-26-2003 at 07:02 AM.
stullis is offline   Reply With Quote