2-24-2018 - Here is a quick update on things

The container of tile is sitting at the Miami Port with a scheduled delivery for Friday. I am drilling the slab for moisture checks this week.

I chatted with Laticrete as suggested. The process was explained as follows,

1. Level the floor and allow to dry
2. Come back with 2 coats of Hydroban (slab humidity Must be less than 75%)

3. Set tile with Latapoxy 300 (Assuming resin backing is in tact)

Once I get the pallets opened I will take pictures and share them. I want to see exactly what we have with respect to the mesh backing and make some decisions from that point.