Durock set into or above deck mud?

Hi there,
I’m building a shower pan and was wondering about the pros and cons to setting Durock into the final layer of deck mud (meaning it is placed prior to doing the final mud layer) versus placing the deck mud first, letting it dry and then placing Durock above the finished level of deck mud.. I have read about doing it both ways but wasn’t sure what the consensus was on the best method to use. I plan on placing Redguard over the CBU prior to setting the tile.
Thanks so much for any insight!