View Single Post
Unread 12-12-2020, 07:05 AM   #17
MesaTileworks
Registered User
 
Join Date: Sep 2008
Location: Staunton, VA
Posts: 208
Am I understanding this right that if I can get that 2/3 of the span or put in a post and support, then the existing joists are sufficiently reinforced... *then* I could sister in new joists that only run the length of the room to be tiled to level the floor and make it a flat plane? (Basically two different solutions to the two problems?) The long joists provide the needed rigidity, and the short ones are tied into the long ones?
MesaTileworks is offline   Reply With Quote