1 1/2" is just barely enough for my application. I have 3/4" for the ply, 1/4" for the cement board and 3/8" for the granite tile. That leaves an 1/8" for thin set on either side of the cement board.

I was thinking of using a finish nail gun to attach the edging to the ply. Should I attach the edging before or after I lay in the tile and cement board?

The "nothing in the joint" was referring to the joint between the edge of the tile and the Maple countertop edging (where the Maple meets the granite). Should I put caulk along that edge or should I put sandless grout there or do I need anything in that joint at all?

Hopefully I have explained myself well enough. This is hard to describe without a drawing. Thanks sooo much for your help.

Thanks,
Bill