View Single Post
Unread 08-12-2015, 08:38 PM   #1
NEPA Remodeling
Custom Home Remodeling
 
Join Date: Oct 2013
Location: Scranton PA
Posts: 120
Leveling Shower Ceiling

I'm doing a 36x52 Kerdi shower with ceramic tile on the ceiling. The ceiling line along the 52" wall is about 1/2" out of level. This will result in an unappealing taper on the final course of 1" subway tile on the wall.

There is already Sheetrock on the ceiling in this area. Can float/level the ceiling either before or after the Kerdi membrane, or must I pull the ceiling, shim it, and replace it?

How have you folks handled this?
__________________
Phil Cavanagh

Kitchen & Bathroom Remodeling Scranton PA
NEPA Remodeling is offline   Reply With Quote