View Single Post
Unread 02-13-2020, 07:01 PM   #57
cx
Moderator emeritus
 
cx's Avatar
 
Join Date: Jul 2001
Location: Boerne, Texas
Posts: 89,572
I set the glass panel edge on clear plastic glazing shims directly on the direct bonded waterproof membrane (if used) after the tiles have been set on one side of the glass. I hold the glass away from those set tiles using tile wedges and block it in place while the tiles are set on the other side of the glass. When finished tiling and grouting, I caulk the glass/tile gaps with color matched sealant. Here's a photo of a small glass pane set on USG Durock Shower System membrane with one side tiled.

Name:  Like This.jpg
Views: 35
Size:  36.4 KBName:  Finished Glass.jpg
Views: 35
Size:  42.8 KB
__________________
CX

Y'ALL NEW VISITORS READ THIS HERE!
cx is offline   Reply With Quote