View Single Post
Unread 09-22-2019, 07:45 PM   #3
ztrain727
Registered User
 
Join Date: Sep 2019
Posts: 29
Yes, it’s uphill! There would be a self priming pump at the other end on a float switch (installed in the linear drain pan) to evacuate the water. And just to be clear the pipe would go above the curb height before penetrating the liner to avoid leaks, but not into or near the curb itself.

Speaking of the curb though, I did cut CBU for it because I was trying to keep the height down and saw some videos of the curb being done this way. My understanding was that the top mud bed locks the inner piece in, then fasteners hold the outside edge of the top piece. Is this a bad idea? What is your preferred method?

It’s 3 pressure treated 2x4’s wrapped in 15# felt, lath and 1/4” Portland cement by the way.
__________________
Zane
ztrain727 is offline   Reply With Quote