View Single Post
Unread 10-21-2017, 07:52 PM   #5
Davy
Moderator -- Mud Man
 
Davy's Avatar
 
Join Date: Jan 2003
Location: Princeton,Tx.- Dallas area
Posts: 32,763
The bathroom floor tiles run right to the edge of the shower, which is fine. But it looks like they stuck half of the tile to the concrete slab and the other half to the pan liner. Not sure that's what they did but they may have. Also, what did they stick the tiles to on the inside of the drop down, between the edge of the step down and the shower floor?

You're not supposed to stick tiles directly to a PVC pan liner.

I like seeing the glue on pan corners and I'm not seeing them. The "shower construction info" thread shows what I'm talking about. That thread is in the "liberry" (dark blue bar above).
__________________
Davy

www.davystephenstile.com
Davy is offline   Reply With Quote