Walls not flat problem

I am tiling the shower walls and right now am about to apply schluter kerdi membrane on top of drywall. I already made the mistake of having drywallers apply tape and joint compound to all the seams so I ended up priming the whole surface. I had confirmed with schulter that it would be fine to install kerdi membrane on primed drywall as long as it was latex primer. So I guess I'm good on that issue.

Now when I am checking for flatness of the walls, I realized that the back wall of the shower has a vertical hump right in the middle of it. I'm guessing that the waste pipe that was installed was sitting just a bit proud of the rest of the studs causing this hump. I think it might be sticking out around 1/4inch out.

How can I solve my problem?
Can I simply apply thinset to the wall in all the low places until it is all on the same plane. Let the thinset harden and then install kerdi membrane with more thinset?

Or should I go ahead and install kerdi membrane on the wall first, then when tiling, slap on more thin set in the low spots to bring the tiles plumb.

Is thinset the right material to use for this or should I use some drypacked mortar?

Any thoughts?

Thanks