View Single Post
Unread 06-08-2021, 12:57 PM   #5
Bearwithmeplease
Registered User
 
Join Date: Jun 2021
Location: Potomac Highlands of West Virginia
Posts: 4


So I pity the horse I'm kicking, but are you saying that two of our options are 1) honor the joint up to essentially a good-sized grout line (filled with something similar looking to the rest our grout, but flexible) and 2) place a wall and doorway over a construction joint? That's okay to do?

I've attached anther picture to show more clearly what we're working with near the back door.

And on another note, we were hoping to have continuous tiling through all of our doorways(now where there isn't a joint). So wouldn't leveling each room separately after framing out complicate that a bit in the doorway where it could be unlevel?
__________________
Amanda
Bearwithmeplease is offline   Reply With Quote