Ceramic Tile Advice Forums - John Bridge Ceramic Tile

Welcome to John Bridge / Tile Your World, the friendliest DIY Forum on the Internet


Advertiser Directory
JohnBridge.com Home
Buy John Bridge's Books

Go Back   Ceramic Tile Advice Forums - John Bridge Ceramic Tile > Tile & Stone Forums > Tile Forum/Advice Board

Sponsors


Reply
 
Thread Tools Search this Thread
Old 09-08-2017, 03:17 PM   #1
prodjsaig
Registered User
 
Join Date: Apr 2016
Location: vancouver, b.c.
Posts: 156
bathroom tile question and cement board

hi hope everyone is having fun keeping busy always figuring out another way to do something.

i am wondering if it is possible to tile my second bathroom. I got the first one out of the way. It is 3/4 ply over 2x10 16' on center with 1.5" lightweight concrete.

I realized I may not be able to tile this bathroom because there is a slight height difference in one of the cracks. picture attached shows where the difference is.

when I took the old vinyl floor out the builders used a 2x12 around the toilet flange. it was all cracked and warped so I replaced with a second layer of 3/4" ply and durock cbu with thinset. the other bath I used 2 extra layers of 3/4" instead of the cbu on top.

its a 5x6 bathroom with tub. so its a small span and when I jump around a bit I dont feel the crack move. what are my chances if I fill the uneven parts with slc and tile with redgard or equivalent? or should I skip the tile alltogether?
Attached Images
 
__________________
Colby
prodjsaig is offline   Reply With Quote
Sponsored Links
Old 09-08-2017, 04:47 PM   #2
Davy
Moderator -- Mud Man
 
Davy's Avatar
 
Join Date: Jan 2003
Location: Princeton,Tx.- Dallas area
Posts: 28,410
Usually, if one side of the crack is higher than the other side, tile is not recommended. If I had to guess, the plywood under the SLC got wet and swelled, causing the SLC to crack. How long is that crack?
__________________
Davy

www.davystephenstile.com
Davy is offline   Reply With Quote
Old 09-08-2017, 10:13 PM   #3
prodjsaig
Registered User
 
Join Date: Apr 2016
Location: vancouver, b.c.
Posts: 156
It goes all the way to the corner of the room. looks like removing the lightweight concrete while doing a tub removal would be appropriate. so Ill just go with the vinyl tile which is pretty durable a lot better than laminate IMO
__________________
Colby
prodjsaig is offline   Reply With Quote
Old 09-08-2017, 11:16 PM   #4
Tool Guy - Kg
Moderator -- Wisconsin Kitchen & Bath Remodeler
 
Tool Guy - Kg's Avatar
 
Join Date: Feb 2005
Location: Oak Creek, WI
Posts: 19,435
Hi, Colby.

Purely as comedy, all the pros who see your egg-beater mixer are cringing at the build-up and are screaming for you to clean it off.
__________________
Tonto Goldstein….. but my friends call me Bubba
Tool Guy - Kg is offline   Reply With Quote
Reply

Stonetooling.com   Tile-Assn.com   National Gypsum Permabase


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Bathtub Tile surround cement board question v4tuna Tile Forum/Advice Board 4 04-15-2011 01:28 AM
Cement board question Telstrot Tile Forum/Advice Board 7 09-09-2006 09:51 AM
Cement Board Question statjunk Tile Forum/Advice Board 3 05-05-2006 09:52 PM
Question about cement board. Sandy Tile Forum/Advice Board 6 03-16-2004 12:40 PM
cement board question focus57 Tile Forum/Advice Board 1 10-05-2003 08:17 PM


All times are GMT -6. The time now is 04:29 AM.


Sponsors

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright 2014 John Bridge & Associates, LLC