View Single Post
Old 10-27-2017, 05:31 PM   #64
kenped86
Registered User
 
Join Date: Mar 2013
Posts: 66
The curb has no preslope and the niche is actually sloped towards the wall. The floor is well sloped since it is the prefab tray set on fairly level concrete. Since the job was paused with thinset over the kerdi on the walls/floor corner can the floor piece and corners be installed or does the thinset need to be cleaned to get the proper bond?

Name:  1.jpg
Views: 184
Size:  34.1 KB

Sent from my SM-G920V using Tapatalk
__________________
Ken

Last edited by jgleason; 10-29-2017 at 06:30 PM.
kenped86 is offline   Reply With Quote