View Single Post
Old 12-13-2006, 08:24 AM   #2
bathroomremodeler
Registered User
 
Join Date: May 2006
Location: Dallas, TX
Posts: 841
You're stressing over nothing. In fact, doing the floor first is the right way if you are concerned with water shed (how the water flows down). If walls first, the water shed goes directly into the grout ... floor first, the water shed goes directly on the tile (which is water proof).

Not a major difference either way though.

Dean
bathroomremodeler is offline   Reply With Quote