View Single Post
Old 05-04-2003, 09:16 AM   #8
davem
Systems Engineer and Moderator, JB Forums
 
davem's Avatar
 
Join Date: May 2002
Location: Dexter, MI
Posts: 13,726
Send a message via AIM to davem Send a message via Yahoo to davem
What kind of wire mesh in top layer of mud?

Q. What type of wire mesh is recommended for the final mud floor?

Quote:
Dave Gobis
da Man!


My answer would be 2x2 galvanized mesh. I have had some 2.5 suspended in floors that cut the mud right in half. Granted, the traffic was a little early.
__________________
Dave Gobis, Exec. Dir. Ceramic Tile Education Foundation
http://www.tileschool.org
Quote:
John Bridge
Mudmeister


I would not use metal lath. As Dave G. points out, it can actually weaken your floor by dividing it into two strata. My good friend Michael Byrne recommends 2x2 reinfrorcing mesh, which is hard for a novice to find. I recommend nothing, unless your shower is super huge.
Update: The ANSI standards (A108.1A, section 2.3.5) no longer require reinforcing wire in the top mud bed of a traditional shower receptor unless the shower floor is larger than 65 square feet.

Last edited by cx; 02-10-2016 at 06:41 PM.
davem is offline