View Single Post
Old 11-05-2017, 09:40 PM   #27
Steve in Denver
Registered User
 
Steve in Denver's Avatar
 
Join Date: Jan 2014
Location: Mile High City
Posts: 888
Posting a picture of the blocking for anyone who stumbles upon this thread in the future.

The joist web was sandwiched with 2x6 pieces (2x4 wasn't wide enough for the joist hangers) on either side with construction adhesive and 4 screws. (pilot holes for the first side of the sandwich).

Blocking was 2x6 installed with joist hangers and screws. Construction adhesive on the top of the block. Joist hangers are probably overkill, but gave me an easy way to install the blocking with some upward pressure with the subfloor.
Attached Images
 
__________________
Steve
Steve in Denver is offline   Reply With Quote