espy
09-17-2007, 08:20 AM
I recently installed a front porch on a 3" mud bed with black slate. I waited about 3 weeks for it to dry out. I then sealed it with HMK satin sealer per customers request.
Now the floor has lots of patches of a light silver. I assume that there was still moisture in the stone and the sealer reacted to it.
Any suggestions as to what to do.
I am going to use HMK's stripper and start all over again, is this the right thing to do.
Now the floor has lots of patches of a light silver. I assume that there was still moisture in the stone and the sealer reacted to it.
Any suggestions as to what to do.
I am going to use HMK's stripper and start all over again, is this the right thing to do.