Bono
11-22-2005, 07:09 PM
Hello - wondering what the recommendation is with the joint (3/8 - 1/4") between the durock and the mud pan. Finished all other joints with thinset and alkali resist tape. Do i then put redgard over the whole area (*walls & floor too?)